Laserfiche WebLink
-4 - <br /> 12. Primar future(Post-mining)land use(check one): <br /> poi <br /> bCropland(CR) D Pastureland(PL) D General Agriculture(GA) <br /> ji Rangeland(RL) D Forestry(FR) -s.. Wildlife Habitat(W'L) <br /> Residential(RS) n Recreation(RC) Industrial;Commercial(IC) <br /> DDeveloped Water Resources(WR) D Solid Waste Disposal(WD) <br /> 13. Primary present land use(check one : <br /> Cropland(CR) Pastureland(PL) General Agriculture(GA) <br /> II Rangeland(RL) Forestry(FR) WildlifeHabitat(W'L) <br /> Residential(RS) D Recreation(RC) . Industrial Commercial(IC) <br /> Developed Water Resources(WR) <br /> 14. Method of Mining: Briefly explain mining method(e.g. truck'shovel): <br /> Bull Dozer and Wheel Loader, Excavation <br /> 15. On Site Processing: F Crushing,Screening <br /> 13.1 Briefly explain mining method(e.g. truck'shovel): <br /> Bull Dozer and Wheel Loader, Excavation <br /> List any designated chemicals or acid-producing materials to be used or stored w ithin permit area: <br /> Concrete Admixtures <br /> 16. Description of Amendment or Conversion: <br /> [(you are amending or converting an existing operation. provide a brief narrative describing the proposed change(s). <br /> The Amendment is Primarily to increase the Operation to 114.2 Acres, and to change <br /> the Name of the Operation to " Robins Consolidated Expansion Pit" <br /> Summit Engineering Job Number: 240328CE 4 <br /> 44 719-589-6147 <br /> Alamosa, CO <br />