My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2024-06-11_REVISION - M2022001 (2)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M2022001
>
2024-06-11_REVISION - M2022001 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/11/2024 1:24:49 PM
Creation date
6/11/2024 1:23:26 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2022001
IBM Index Class Name
Revision
Doc Date
6/11/2024
Doc Name
Notice of Decision
From
DRMS
To
Red Tierra Equities, L.L.C.
Type & Sequence
TR1
Email Name
JPL
JLE
Media Type
D
Archive
No
Supplemental fields
Permit Order
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> <br /> <br /> <br /> <br /> <br />June 11, 2024 <br /> <br /> <br />Robert Lembke <br />Red Tierra Equities, L.L.C. <br />8301 East Prentice Avenue, Suite 120 <br />Greenwood Village, CO 80111 <br /> <br /> <br />Re: Section 20 Gravel Mine - File No. M-2022-001 <br /> Red Tierra Equities, L.L.C. <br /> Technical Revision (TR-1) <br /> Change to a Phased Mining and Bonding Plan <br /> <br />Dear Robert Lembke: <br /> <br />On June 11, 2024 the Division of Reclamation, Mining and Safety concluded its review of the <br />Technical Revision application submitted to the Division on April 29, 2024, addressing the following: <br /> <br />Maximum allowed disturbance at any one time is limited to 43 acres consisting of the North and <br />South Infiltration Ponds. Any additional mining related disturbances beyond the 43 acres will require <br />a Technical Revision. <br /> <br />The permittee will update t he groundwater monitoring plan through a Technical Revision prior to <br />submitting the results of the baseline groundwater monitoring data and prior to exposing groundwater <br />at the Site. <br /> <br />The Division accepts the reclamation cost estimate of $50,658.00 for this inital phase od mining. The <br />permittee will have to submit a separate Surety Reduction request to reduce the currently held <br />Financial Warranty. <br /> <br />The decision reached by the Division is: approve. <br /> <br />The terms of Technical Revision No. 1 approved by the Division are hereby incorporated into Permit <br />No. M-2022-001 . All other conditions and requirements of Permit No. M-2022 -001 remain in full <br />force and effect. <br /> <br /> <br />Bond Held: $5,399,350.00 <br />Prior Liability: $5,399,350.00 <br />Change in Liability: $0.00
The URL can be used to link to this page
Your browser does not support the video tag.