Laserfiche WebLink
EXHIBIT D -Reclamation Plan <br /> Rule 6.3.4 <br /> The purpose of the Reclamation Plan is to describe the timing, procedures, criteria and materials that will <br /> be used to reclaim the affected land to the proposed future land use. This plan must be correlated to <br /> Exhibit E - Map. <br /> 1) Primary future(Post-mining) land use (check one): <br /> El Cropland(CR) ❑ Pastureland (PL) ❑ General Agriculture (GA) <br /> ElRangeland (RL) ❑ Forestry (FR) El Wildlife Habitat (WL) ** <br /> n Residential (RS) n Recreation (RC) rl Industrial/Commercial (IC) <br /> n Developed Water Resource (WR) <br /> **Note: The Colorado Parks & Wildlife (CPW) must be consulted where wildlife use is the <br /> proposed future land use. <br /> 2) Please provide a general description of how the mined area will be reclaimed: <br /> Following mining operations all slopes will be graded to conform to 4:1 or shallower, and made <br /> to drain, then topsoil will be re-spread to cover any areas of disturbance. Following topsoil <br /> spreading the disturbed areas will be ripped and seeded, including any previous stockpile <br /> areas.No overburden material is anticipated but it encountered overburden will be spread <br /> evenly across the site prior to topsoil placement. <br /> 3) Specify which ponds, streams, roads and buildings, if any, will remain after reclamation. <br /> These features must be shown on the Exhibit E-Map: <br /> All existing roads, and structures will remain following reclaimation. <br /> Note: if ponds are a part of the Reclamation Plan, slopes from 5 vertical feet above to 10 <br /> vertical feet below the expected average water level cannot be steeper than 3H:1V; remaining <br /> slope lengths may not be steeper than 2H:1V (see example sketch below). <br /> S' <br /> .............. <br /> T <br /> 10' 1 <br /> 1 3 <br />