Laserfiche WebLink
on the drawings. The prepared surface shall be free from loose earth, rocks, rubble and other foreign matter. <br /> Generally, no rock or other object larger than USCS sand (SP) should remain on the subgrade in order to provide <br /> an adequate safety factor against puncture. Geotextiles may be used to compensate for irregular subgrades. <br /> The subgrade shall be uniformly compacted to ensure against settlement.The surface on which the lining is to <br /> be placed shall be maintained in a firm, clean, dry and smooth condition during lining installation. <br /> 1.10 Lining Installation <br /> Prior to placement of the liner, the installer will indicate in writing to the owner or his representative that he <br /> believes the subgrade to be adequately prepared for the liner placement. <br /> The lining shall be placed over the prepared surface in such a manner as to assure minimum handling. The <br /> sheets shall be of such lengths and widths and shall be placed in such a manner as to minimize field seaming. <br /> In areas where wind is prevalent, lining installation should be started at the upwind side of the project and <br /> proceed downwind. The leading edge of the liner shall be secured at all times with sandbags or other means <br /> sufficient to hold it down during high winds. <br /> Sandbags or rubber tires may be used as required to hold down the lining in position during installation. <br /> Materials, equipment or other items shall not be dragged across the surface of the liner, or be allowed to slide <br /> down slopes on the lining. All parties walking or working upon the lining material shall wear soft-sole shoes. <br /> Lining sheets shall be closely fit and sealed around inlets, outlets and other projections through the lining. <br /> Lining to concrete seals shall be made with a mechanical anchor, or as shown on the drawings. All piping, <br /> structures and other projections through the lining shall be sealed with approved sealing methods. <br /> 1.11 XR-5 Field Seaming <br /> All requirements of Section 1.04 and 1.05 apply. A visible bead should be extruded from the hot air welding <br /> process. <br /> Field fabrication of lining material will not be allowed. <br /> 1.12 Inspection <br /> All field seams will be tested using the Air Lance Method. A compressed air source will deliver 55 psi minimum <br /> to a 3/16 inch nozzle. The nozzle will be directed to the lip of the field seam in a near perpendicular direction <br /> to the length of the field seam. The nozzle will be held 4 inches maximum from the seam and travel at a rate <br /> not to exceed 40 feet per minute. Any loose flaps of 1/8" or greater will require a repair. <br /> Alternatively all field seams should also be inspected utilizing the Vacuum Box Technique as described in <br /> Standard Practice for Geomembrane Seam Evaluation by Vacuum Chamber(ASTM D 5641-94(2006)), using a 3 <br /> to 5 psi vacuum pressure. All leaks shall be repaired and tested. <br /> All joints, on completion of work, shall be tightly bonded. Any lining surface showing injury due to scuffing, <br /> penetration by foreign objects, or distress from rough subgrade, shall as directed by the owner or his <br /> representative be replaced or covered, and sealed with an additional layer of lining of the proper size, in <br /> accordance with the patching procedure. <br /> 1.13 Patching <br /> Any repairs to the lining shall be patched with the lining material.The patch material shall have rounded <br /> corners and shall extend a minimum of four inches (4") in each direction from the damaged area. <br /> Seam repairs or seams which are questionable should be cap stripped with a 1" wide (min.) strip of the liner <br /> material.The requirements of Section 1.11 apply to this cap stripping. <br /> 1.14 Warranty <br /> The lining material shall be warranted on a pro-rated basis for 10 years against both weathering and chemical <br /> compatibility in accordance with Seaman Corporation warranty for XR-5®Style 8130. A test immersion will be <br /> performed by the owner and the samples evaluated by the manufacturer.Workmanship of installation shall be <br /> warranted for one year on a 100% basis. <br /> 21 <br />