My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2024-06-10_REVISION - M2012032
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M2012032
>
2024-06-10_REVISION - M2012032
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/11/2024 9:01:01 AM
Creation date
6/11/2024 8:58:23 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2012032
IBM Index Class Name
Revision
Doc Date
6/10/2024
Doc Name
Request for Technical Revision
From
Thorin Resources, LLC
To
DRMS
Type & Sequence
TR17
Email Name
LJW
THM
EL1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
100
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
N <br /> X O <br /> A <br /> m <br /> June 6th, 2024 <br /> Colorado Division of Reclamation, Mining and Safety <br /> 1313 Sherman Street, Room 215 <br /> Denver, Colorado 80203 <br /> Attention: Lucas West <br /> SUBJECT: Revenue Mine, Permit No. M-2012-032, FAFO Holdings LLC and Camp Bird Mine, <br /> Permit M-1982-090, Caldera Mineral Resources LLC,Technical Revision <br /> Dear Mr. West <br /> Please find our submission for Technical Revision ("TR") on behalf of Thorin Resources <br /> LLC ("Thorin") and our permit holder entities FAFO Holdings LLC ("FAFO") Permit M-2012-032 <br /> and Caldera Mineral Resources LLC ("Caldera") Permit M-1982-090. Both permitted entities are <br /> owned and managed by Thorin. Our TR proposes operating up to 75 tons per day of material at <br /> the Revenue mine site. Our proposal is within current permitted limits, and the Revision is <br /> intended to create a specialized 75-ton-per-day process circuit with a two-fold purpose: First to <br /> create a precious metal concentrate using an acid &chemical free gravity separation circuit.And <br /> second to complete research and development work for the potential of creating a mining <br /> concentrate focused on critical metals as defined under the Energy Act of 2020. <br /> TR has three specific areas for consideration: <br /> 1. Request approval to operate a seventy-five (75) ton per day gravity separation circuit <br /> within current permit limits. <br /> 2. Request approval for the Revenue Mine(Permit M-2012-032)to accept imported material <br /> from Camp Bird Mine (Permit M-1982-090). <br /> 3. Request approval for the Camp Bird Mine (Permit M-1982-090) to export material to the <br /> Revenue Mine (Permit M-2012-032). Only inert surface material at Camp Bird is being <br /> considered for export. <br /> 1 <br /> 1900 MAIN ST, UNIT 1 I PO BOX 1030 I OURAY CO 81427 <br />
The URL can be used to link to this page
Your browser does not support the video tag.