My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2024-06-07_GENERAL DOCUMENTS - C1981014
DRMS
>
Day Forward
>
General Documents
>
Coal
>
C1981014
>
2024-06-07_GENERAL DOCUMENTS - C1981014
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/12/2024 8:23:23 AM
Creation date
6/11/2024 7:28:53 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981014
IBM Index Class Name
General Documents
Doc Date
6/7/2024
Doc Name
Proposed Decision and Findings of Compliance
From
DRMS
To
Energy Fuels Coal, Inc.
Type & Sequence
SL5
Permit Index Doc Type
Findings
Email Name
ZTT
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
parcel and are evaluated using a weighted average summation of transplant clump density <br /> and seeded area wood plant density. <br /> Requirements for demonstrations of sample adequacy and revegetation success for cover <br /> and productivity can be found in Rule 4.15.11(2). <br /> Hydrology <br /> Additionally, Rule 3.03.2(2)requires the Division's review of bond releases to include <br /> consideration of whether pollution of surface or subsurface water is occurring,the <br /> probability of occurrence of such pollution, and the estimated cost of abating such <br /> pollution. <br /> Section IV—Observation and Findings <br /> The following discussion of observations and findings focuses on the results of the <br /> reclamation success at the remaining areas of the Southfield Mine. The evaluation of the SL- <br /> 05 Phase III bond release and ToJ included the bond release inspection, an office review of <br /> pertinent requirements and regulatory criteria, and review of past inspection reports. The <br /> bond release inspection was conducted on July 8, 2021. Several items were reviewed by the <br /> Division during the technical evaluation required for bond release before, during, and <br /> after the inspection. During the inspection,the entire Southfield Mine area was observed <br /> to allow for visual assessment of compliance with pertinent requirements. Geo-referenced <br /> permit boundaries and GPS were utilized to verify location of permanent features and to <br /> record field data relevant to specific site locations. <br /> Phase I <br /> The NW-MW area, Substation 92 pad and associated roads were previously approved for <br /> Phase I bond release under Bond Release applications SL-03 and SL-04. However,these <br /> portions of the Southfield Mine were inspected as part of the SL-05 inspection. <br /> Participants during the inspection walked the bond release area to allow for visual <br /> assessment of compliance with relevant requirements. For Phase I, observations were <br /> made during the bond release inspection with regard to AOC,performance of the <br /> reconstructed topography, and stability of the constructed permanent diversion. To <br /> determine compliance with the Southfield Mine's approved AOC in the SL-05 area, the <br /> Division navigated the entire permit area with the GPS assistance of ESRI Collector. <br /> Southfield Mine <br /> Permit No.C-1981-014 June 7,2024 <br /> 8 <br />
The URL can be used to link to this page
Your browser does not support the video tag.