My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2024-06-07_PERMIT FILE - M2024026 (31)
DRMS
>
Day Forward
>
Permit File
>
Minerals
>
M2024026
>
2024-06-07_PERMIT FILE - M2024026 (31)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/11/2024 7:22:14 AM
Creation date
6/10/2024 11:01:24 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2024026
IBM Index Class Name
Permit File
Doc Date
6/7/2024
Doc Name Note
Exhibit L - Reclamation Costs
Doc Name
Application
From
Colorado Sand Company II, LLC
To
DRMS
Email Name
NCG
JLE
EL1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Exhibit L <br /> Page 1 <br /> EXHIBIT L <br /> RECLAMATION COSTS <br /> Per Rule 6.4.12–Reclamation Costs: <br /> (1) All information necessary to calculate the costs of reclamation must be submitted and broken down into the <br /> various major phases of reclamation. The information provided by the Operator/Applicant must be sufficient <br /> to calculate the costs of reclamation that would be incurred by the state;and, <br /> (2) The Office may request the Operator/Applicant to provide additional,reasonable data to substantiate said <br /> Operator/Applicant's estimate of the cost of reclamation for all Affected Lands. <br /> Colorado Sand Company II, LLC(CSC)herein provides the following discussion pertaining to the respective <br /> Reclamation Cost components,along with Table L-1: Reclamation Cost Estimate which details, in a tabulated <br /> format,the respective reclamation phases,the therein contained individual component(direct)costs,and a <br /> totalization of those direct costs. CSC has then added the following indirect costs to the totalized direct cost,to <br /> include the following: <br /> • Liability Insurance(2%of Direct Cost Total) <br /> • Performance Bond(1.05%of Direct Cost Total) <br /> • Job Superintendent($8,750/month,inclusive of 40%benefits burden—for 6-month duration) <br /> • Contractor Profit(10%of Direct Cost Total) <br /> • Engineering and Bid Preparation(4.25%of Direct Cost Total) <br /> • Reclamation Management and Administration(5%of Direct Cost Total) <br /> As detailed in Exhibit D: Mining Plan and Exhibit E: Reclamation Plan,the Kersey Mine will employ <br /> "concurrent reclamation"throughout the life-of-mine,thus minimizing outstanding reclamation obligations at the <br /> time of closure.In addition to the concurrent reclamation activities associated with annual mine blocks,CSC has <br /> also employed"advance reclamation"of certain features(as described below). <br /> The Table L-1:Reclamation Cost Estimate addresses/includes all activities associated with closure and <br /> reclamation of probable"maximum exposure"conditions that would be present at the end of life-of-mine. The term <br /> "maximum exposure"is generally indicative of(final)reclamation requirements associated with the final(i.e., <br /> terminal)pit reclamation obligation,to include full process plant and facilities demolition,recontouring and <br /> revegetation,and"full build-out"of the process waste stockpile. The subject reclamation conditions and post- <br /> mining topography are depicted in Exhibit F: Reclamation Plan(consistent with the requirements of Rule 4.2– <br /> Financial Warranty Liability Amount). <br /> Colorado Sand Company II,LLC <br /> Kersey Mine Construction Material Regular(112)Operation Reclamation Permit Application <br /> June 7,2024 <br />
The URL can be used to link to this page
Your browser does not support the video tag.