Laserfiche WebLink
Exhibit H <br /> Page 6 <br /> (C) Identify the presence and estimated population of threatened or endangered species from either federal or <br /> state lists. <br /> Refer to Item(a)above for discussion relative to threatened or endangered species from either federal or state lists. <br /> (d) Provide a description of the general effect during and after the proposed operation on the existing wildlife <br /> of the area,including,but not limited to,temporary and permanent loss offood and habitat,interference <br /> with migratory routes,and the general effect on the wildlife from increased human activity,including noise. <br /> Impacts on local wildlife during construction and regular operations within the Permit Area will vary by degree <br /> depending on species and seasonal timing.Species that utilize the Permit Area year-round or for breeding/nesting <br /> will be impacted more than species that may only use the Permit Area for foraging or short-term use,as a stopover <br /> point during migration.Likewise, some more adaptable species may tolerate disturbances better than more sensitive <br /> species. Certain species may temporarily avoid the Permit Area and/or adjacent lands during construction and <br /> regular operations due to noise,illuminated areas,or anthropogenic activity. Habitat loss or alteration also would <br /> result in the direct loss of smaller,less mobile species of wildlife (e.g., small mammals and reptiles)and the <br /> displacement of more mobile species into adjacent habitats. <br /> Of greatest concern for biological resources within the region is the loss or alternation of associated suitable <br /> breeding habitat for migratory bird species and species associated with prairie dog colonies and other mammal <br /> burrows. Burrowing owls, which are State-listed as threatened,are known to use the Permit Area.Potential direct <br /> impacts on breeding burrowing owls as a result of mine-related activities could include abandonment of a breeding <br /> territory or nest site or the potential loss of eggs or young,which would reduce productivity for that breeding <br /> season,if present. <br /> Habitat available for wildlife,including special status species,within the Permit Area is currently impacted by <br /> existing oil and gas construction and operation. While the projected life-of-mine for the Kersey Mine is on the order <br /> of twenty(20)years,inclusive of pre-development,production,and closure and reclamation activities,it can be <br /> considered a "temporary"use of the land.Further to this,the mmmg operations will employ a progressive pit with <br /> concurrent reclamation;that is,the active mine pit will advance across the Permit Area with concurrent reclamation <br /> (revegetation)occurring immediately following the completion of minmg within a given year's mine block.After <br /> the regular operations cease and the land is reclaimed,species use of the Permit Area will likely return to its pre- <br /> mining state.Accordingly, the duration of loss of food and/or habitat will effectively be decreased to a period of <br /> time significantly less than the full projected life-of-mine;and,in such a manner that revegetation(and habitat <br /> restoration)will be occurring on a continuing basis,utilizmg native habitat grasses and forbs to re-establish habitat <br /> to the post-mming designated land use. <br /> CSC plans to coordinate with USFWS and CPW on the field survey results (Exhibit H-1) and to develop applicable <br /> avoidance and minimization measures to reduce impacts on significant wildlife resources. <br /> To reduce impacts on nesting birds and ensure compliance with the Migratory Bird Treaty Act,CPW recommends <br /> implementing avoidance measures such as performing land clearing/disturbance and existing facilities demolition <br /> outside the breeding season(August 1 through March 14).If land disturbance and facilities demolition will occur <br /> during the breeding season(March 15 through July 31),pre-construction surveys for nesting bitrrds should be <br /> conducted and active nest buffers and avoidance periods should be implemented. <br /> Colorado Sand Company II,LLC <br /> Kersey Mine Construction Material Regular(112)Operation Reclamation Permit Application <br /> June 7,2024 <br />