Laserfiche WebLink
Exhibit E <br /> Page 6 <br /> condition until/when deposited atop the(mined out)pit floor.Using dozers and/or other suitable equipment,the <br /> material will then be spread in a manner that achieves a relatively consistent and nominal 8-to 12-inch cover across <br /> the entire pit floor area. Other than the limited(and unavoidable)heavy equipment induced compaction,no <br /> compaction is specified or proposed. Rather, natural consolidation, as a component of the re-placement, is the <br /> desired objective(prior to seed application)to facilitate final revegetation efforts. <br /> The planned replacement thickness for growth medium is virtually equivalent to that removed during pre-stripping <br /> activities(that being a nominal 8 to 12-inches as the objective).However,due to localized surface irregularities,etc., <br /> CSC anticipates that the replacement thickness may vary from location to location,but on an overall average basis, <br /> will likely remain within the targeted objective of 8 to 12 inches. <br /> Colorado Sand Company II, LLC <br /> Kersey Mine Construction Material Regular(112)Operation Reclamation Permit Application <br /> June 7,2024 <br />