My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2024-06-07_PERMIT FILE - M2024026 (23)
DRMS
>
Day Forward
>
Permit File
>
Minerals
>
M2024026
>
2024-06-07_PERMIT FILE - M2024026 (23)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/11/2024 7:22:14 AM
Creation date
6/10/2024 10:43:12 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2024026
IBM Index Class Name
Permit File
Doc Date
6/7/2024
Doc Name Note
Exhibit D - Mining Plan
Doc Name
Application
From
Colorado Sand Company II, LLC
To
DRMS
Email Name
NCG
JLE
EL1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
40
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Exhibit D <br /> Page 19 <br /> is slated for use in concurrent reclamation, in addition to approximately 4,000 cubic yards to be taken <br /> from TS-1,thus reducing the cumulative total of TS-1 stored material to approximately 516,000 cubic <br /> yards. Some 862,000 cubic yards of process discard are projected to be placed in the PDS, bringing the <br /> total volume in the PDS to approximately 14.9 million cubic yards. <br /> Year 18: Consistent with the depicted Year 17 easterly shift(i.e.,full-length panel), Year 18 continues the <br /> southward progression through the northern portion of Section 15. Planned production over the projected <br /> 79.9-acre mine block is set at approximately 5.1 million tons for the year. The full extent(approximately <br /> 140,000 cubic yards)of pre-strip growth medium is slated for use in concurrent reclamation,in addition to <br /> approximately 15,000 cubic yards to be taken from TS-1,thus reducing the cumulative total of TS-1 <br /> stored material to approximately 501,000 cubic yards. Some 883,000 cubic yards of process discard are <br /> projected to be placed in the PDS,bringing the total volume in the PDS to approximately 15.8 million <br /> cubic yards. <br /> Year 19: In a similar manner,Year 19 mining activity continues the southward progression, advancing <br /> into the central portion of Section 15. Planned production over the projected 67.5-acre mine block is set at <br /> approximately 5.0 million tons for the year. The full extent(approximately 125,000 cubic yards)of pre- <br /> strip growth medium is slated for use in concurrent reclamation, in addition to approximately 17,000 cubic <br /> yards to be taken from TS-1,thus reducing the cumulative total of TS-1 stored material to approximately <br /> 485,000 cubic yards. Some 868,000 cubic yards of process discard are projected to be placed in the PDS, <br /> bringing the total volume in the PDS to approximately 16.7 million cubic yards. <br /> Year 20: The final LOM year depicted on Exhibit D-2: Mine Plan is Year 20,during which the continued <br /> southward progression completes the mining of the northern one-half of Section 15. CSC notes that <br /> additional mineable resources remain within TMDZ-2(to the immediate south of the Year 20 progression <br /> termination line)and TMDZ-1 (largely within Section 14 and over to the east of TMDZ-2),respectively. <br /> Planned production over the projected 68.7-acre Year 20 mine block is set at approximately 5.0 million <br /> tons for the year.Nearly all(approximately 107,000 cubic yards)of pre-strip growth medium is slated for <br /> use in concurrent reclamation,with a small surplus volume of approximately 3,000 cubic yards being <br /> routed to TS-1,the result being a fmal cumulative total of TS-1 stored material of approximately 488,000 <br /> cubic yards. Some 873,000 cubic yards of process discard are projected to be placed in the PDS,bringing <br /> the final total volume in the PDS to approximately 17.6 million cubic yards. <br /> At the end of Year 20(i.e.,full build-out),the PDS feature is anticipated to occupy an approximately 173- <br /> acre footprint area,with an anticipated height of 100-to 120 ft as measured from the pit floor. The top of <br /> the feature is estimated to encompass approximately 73-acres in surface area. <br /> The TS-1 feature is anticipated to occupy an approximately 60-acre footprint area,with an anticipated 85- <br /> ft height at full build-out;however,this feature will be removed(in its entirety)as it will be utilized in <br /> final site reclamation activities. <br /> • Post Year 20(Potential Extension of Mine Life Within TMDZ-1 and/or TMDZ-2) <br /> Post Year 20(Temporary Mining Deferral Areas): As indicated earlier,CSC has identified and set aside <br /> two discrete "Temporary Mining Deferral Zones"(TMDZ-1 and TMDZ-2,respectively),within which <br /> there remain deficiencies in the geologic database as to definitive mineable resource characteristics <br /> Colorado Sand Company II, LLC <br /> Kersey Mine Construction Material Regular(112)Operation Reclamation Permit Application <br /> June 7,2024 <br />
The URL can be used to link to this page
Your browser does not support the video tag.