Laserfiche WebLink
Exhibit D <br /> Page 11 <br /> activity.At that point,the respective haul road(or segment thereof)will be converted over to"service road" <br /> dedicated to reclamation access only,when the respective road(or segment thereof)will be significantly reduced in <br /> overall width(e.g., essentially reduced to a "two-track"configuration). Thereafter,the reclamation"service roads" <br /> will be dedicated to the support of reclamation monitoring and maintenance and other light duty access travel.On <br /> conclusion of all mining(and reclamation)activities,each of the remaining two-track roadways will be reclaimed <br /> via scarification and reseeding over the full extent via a"retreat"mode. Thus,certain portions of the reclamation <br /> "service roads"would be fully reclaimed upon conclusion of a five-year post-closure monitoring and maintenance <br /> period. <br /> 4.3 Mining Equipment Roster <br /> The mining equipment roster to be employed at the Kersey Mine is anticipated to include the following <br /> representative units: <br /> TABLE D-1. LIST OF MINING EQUIPMENT <br /> Type Size Qty Application <br /> Mining <br /> Hydraulic Excavator John Deere 870(6 Yd3)* 1 Mining/Loading <br /> Front-End Loader John Deere 844(7 Yd3)* 3 Mining/Loading&Plant/Misc. <br /> Dozer John Deere 950* 1 Mining/Utility <br /> Articulated Haul Truck Truck John Deere 460 ADT(46 ton)* 5 Haul Pit to Plant/Reclamation <br /> Water Truck 10,000 gal.Capacity* 1 Dust Control/Road Maintenance <br /> Support Equipment <br /> Roller Compactor 1 Site Prep/Road Maintenance <br /> Utility Pickup Ford F250* 3 Utility/Supervisory/Crew <br /> Track Loader John Deere 323* 2 Misc. Plant Area Clean up <br /> UTV Kubota 1140* 5 General Site Transportation <br /> *Or equivalent.Unit specified is for size and horsepower representation only;actual unit(s)may vary <br /> Inasmuch as emergency response services are available locally through the Galeton Fire Protection District(GFPD), <br /> no specific ambulatory or other emergency vehicles will be incorporated into the mine equipment suite. In addition <br /> to its own emergency response capabilities,GFPD maintains mutual aid agreements with surrounding fire and <br /> ambulance services such as those available in the Platte Valley,Eaton,and/or Ault Fire Protection Districts. GFPD <br /> is staffed 24/7,with career and volunteer/reserve personnel providing structure and wildland fire response, <br /> emergency medical services,basic life support,motor vehicle extrication and water/ice rescue. GFPD also provides <br /> hazardous materials operations level first response and its staff are members of the Greeley Regional HazMat Team <br /> for more complex incidents. The GFPD also provides an Advanced Life Support Paramedic Transport Ambulance <br /> operated by Global Medical Response through a contract with Banner Health. <br /> CSC has developed an initial life-of-mine(LOM)plan,to include a"conceptual-level"projected material balance as <br /> generally described below(and graphically depicted in Exhibit D-2: Mine Plan). While the following is generally <br /> descriptive of the planned mining sequence and progression,CSC shall retain the latitude to modify the described <br /> mine plan in the event unforeseen circumstances arise and/or where operational efficiencies can be gained. For <br /> Colorado Sand Company II, LLC <br /> Kersey Mine Construction Material Regular(112)Operation Reclamation Permit Application <br /> June 7,2024 <br />