Exhibit D <br /> Page 9 <br /> All administrative and plant facilities, and related processing activities(to include product load-out)will be located <br /> in the central portion of Section 2; T5N, R63W,with plant ingress and egress extending directly from Weld County <br /> Road 68 by means of a private(controlled access)paved road extending south from Weld County Road 68 to the <br /> Permit Area. The controlled access segment(e.g.,the private road)functions as such due to the presence of a 24- <br /> hour per day manned security office located at the intersection of Weld County Road 68 and the site access private <br /> road. <br /> Following plant facilities development,mining will commence in the northeast portion of the Permit Area(within <br /> Section 2)at a box cut location westerly adjacent to the plant facilities(to simultaneously establish a process discard <br /> stockpile location and provide the initial material to the ROM(i.e.,plant feedstock)stockpile proximal to the wet <br /> plant facilities. Mining will then generally advance to the west across Section 3;T5N;R63W(Years 2 through 7), <br /> ultimately terminating its westward advance at the east edge of existing natural gas and oil infrastructure located on <br /> the western quarter of Section 3; T5N;R63W. Thereafter,mining will transfer over to areas south of the mine plant, <br /> more specifically through the south quarter of Section 2;T5N; R63W, continuing a southerly advance into Section <br /> 11;T5N;R63W(latter portion of Year 7 through early Year 10)at which point the TMDZ-1 boundary is <br /> encountered. Mine planning within TMDZ-1 remains indeterminate at this juncture due to a paucity of drill hole <br /> data;however,CSC reserves the right to incorporate some or all of this area into the long-term mine plan. <br /> Upon encountering TMDZ-1,the active mine pit will be moved over to the west,with a new box cut opening pit <br /> operations in the northeast portion of Section 10;T5N;R63W(latter portion of Year 10),thence advancing westerly <br /> through Year 12,followed by movement to the south in Year 13. Years 14 through 20 will exploit the remainder of <br /> Section 10, advancing into Section 15;T5N; R63W and continuing to a southern terminus at the approximate mid- <br /> point of Section 15(through the end of Year 20), at which point TMDZ-2 is encountered. As is the case with the <br /> above-mentioned TMDZ-1,mine planning within TMDZ-2(which also extends easterly into the SW 1/4 of Section <br /> 14; T5N;R63W and abuts TMDZ-1)also remains indeterminate at this juncture due to a paucity of drill hole data; <br /> however,CSC reserves the right to incorporate portions thereof, or the full extent of these areas into the long-term <br /> mine plan, as well. Each of the TMDZ areas are depicted on Exhibit D-2: Mine Plan. <br /> 4. Mining Plan <br /> Industrial sand will be mined from an open-cut pit utilizing direct excavation methods(e.g.,no blasting will be <br /> employed). Mining will generally be conducted via a single or two-bench configuration(dependent on the localized <br /> resource depth profile)employing hydraulic excavator and/or front-end loader units for excavation and loading of <br /> ROM material to dedicated off-road articulated haul truck(s). <br /> 4.1 Mine Operating Schedule <br /> The Kersey Mine operations are anticipated to operate on a continuous 24-hour per day basis,seven days per week. <br /> An estimate between 20 and 40 persons are anticipated for each 12-hour shift,to include about 4 to 8 management <br /> and administrative personnel and about 16 to 32 equipment operators/laborers. Operating hour schedules and/or <br /> employee counts may be modified if production and/or market conditions warrant doing so. <br /> 4.2 Mine Access Route and In-Pit Haul Roads <br /> Mine-related traffic will largely arrive and depart the general area via Colorado State Highway 392,which extends <br /> northeasterly from the Greeley area to Colorado State Highway 14,near the Town of Briggsdale. The Kersey Mine <br /> Colorado Sand Company II, LLC <br /> Kersey Mine Construction Material Regular(112)Operation Reclamation Permit Application <br /> June 7,2024 <br />