Laserfiche WebLink
Table of Contents <br /> DRMS-VOLUME 1 <br /> Construction Material Regular(112)Operation Reclamation Permit Application Package APP 1 <br /> EXHIBIT A:Legal Description A-1 <br /> Exhibit A-1: Metes and Bounds Parcel Description A-4 <br /> Exhibit A-2: Site Topography A-5 <br /> Exhibit A-3: General Site Location A-6 <br /> Exhibit A-4: Site Access A-7 <br /> Exhibit A-5: Mine Access Route A-8 <br /> EXHIBIT B: Index Map B-1 <br /> Exhibit B-1: Index Map B B-2 <br /> EXHIBIT C: Pre-mining and Mining Plan Map(s)of Affected Lands C-1 <br /> Exhibit C-1: Relevant Features and Adjoining Surface Ownership C-2 <br /> Exhibit C-2: Affected Area and Localized Topography C-3 <br /> Exhibit C-3: Affected Area Vegetation C-4 <br /> Exhibit C-4: Affected Area Soils C-5 <br /> Exhibit C-5: Surface and Groundwater Resources C-6 <br /> EXHIBIT D:Mining Plan D-1 <br /> Exhibit D-1:Plan of Operations—Kersey Mine D-7 <br /> 1. Introduction D-7 <br /> 2.Oil and Gas Production Infrastructure Considerations D-7 <br /> 3.Permit Area and General Mine Plan Progression D-8 <br /> 4. Mining Plan D-9 <br /> 4.1 Mine Operating Schedule D-9 <br /> 4.2. Mine Access Route and In-Pit Haul Roads D-9 <br /> 4.3.Mining Equipment Roster D-11 <br /> Table D-1: List of Mining Equipment D-11 <br /> 4.4.Pre-Production Site Development D-12 <br /> 4.5.Mining Sequence and Annual Production D-12 <br /> 4.6.Completion of Mining-Final Site Closure and Reclamation(Terminal Pit and Plant Area) D-20 <br /> 5.Processing Plant Operations D-20 <br /> 5.1.Overview-General Process Flow D-21 <br /> 5.2.Plant Operating Schedule D-22 <br /> 5.3.Plant Facilities D-23 <br /> 6. Glossary D-26 <br /> Exhibit D-2: Mine Plan D-27 <br /> Exhibit D-3:Process Plant and Facilities Layout D-28 <br /> Exhibit D-4.Process Flow Diagram D-29 <br /> Exhibit D-5:User of Polymers D-30 <br /> EXHIBIT E: Reclamation Plan E-1 <br /> Topsoil Segregation,Preservation,and Replacement E-5 <br /> Stabilization,Grading, and Compaction of Spoil E-6 <br /> Table E-1:Reclamation Sequence and Projected Material Balance E-8 <br /> Seedbed Preparation, Seed Mix,and Timing of Seeding E-10 <br /> Table E-2:Seed Mixture and Application Rate E-13 <br /> Colorado Sand Company II, LLC <br /> Kersey Mine Construction Material Regular(112)Operation Reclamation Permit Application <br /> June 7,2024 <br />