My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2024-06-06_REVISION - C2010089 (2)
DRMS
>
Day Forward
>
Revision
>
Coal
>
C2010089
>
2024-06-06_REVISION - C2010089 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/6/2024 2:13:54 PM
Creation date
6/6/2024 2:12:25 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C2010089
IBM Index Class Name
Revision
Doc Date
6/6/2024
Doc Name
Proposed Decision Letter & Form
From
DRMS
To
Elk Ridge Mining and Reclamation, LLC
Type & Sequence
TR25
Email Name
CCW
THM
Media Type
D
Archive
No
Supplemental fields
Permit Order
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> <br /> <br />1313 Sherman Street, Room 215, Denver, CO 80203 P 303.866.3567 F 303.832.8106 https://drms.colorado.gov/ <br />Jared Polis, Governor | Dan Gibbs, Executive Director | Michael A. Cunningham, Director <br />June 6, 2024 <br /> <br /> <br />Chris Gilbreath <br />Elk Ridge Mining and Reclamation, LLC <br />P.O. Box 33695 <br />Denver, CO 80233 <br /> <br /> <br />Re: New Horizon North Mine (Permit No. C-2010-089) <br /> Proposed Decision - Technical Revision No. 25 (TR-25) <br /> TR-25 <br /> <br /> <br />Dear Mr. Gilbreath: <br /> <br />Enclosed you will find the Division of Reclamation, Mining and Safety's Proposed Decision for <br />Technical Revision No. 25 at the New Horizon North Mine. Notice of the proposed decision will be <br />published in the San Miguel Basin Forum as soon as possible. The day following the first publication <br />will initiate the ten (10) day public comment period for the Division's decision. <br /> <br />Please refer to the Performance Bond heading on the enclosed proposed decision form. If the amount <br />of Bond Held equals or exceeds the Revised Liability, you need not submit additional bond. However, <br />if the Revised Liability exceeds the Bond Held, please submit additional bond or rider to your existing <br />bond that equals or exceeds the Revised Liability. This Technical Revision must not be implemented <br />until this proposed decision becomes final and until any required increase in bond is submitted to and <br />approved by the Division. <br /> <br />If there are stipulations attached, please sign and return the proposed decision form to the Division. <br /> <br />If you have any questions, please contact me. <br />
The URL can be used to link to this page
Your browser does not support the video tag.