Laserfiche WebLink
<br />2.05-75 Rev. 11/96- PR07; 04/06-PR10; 12/14- TR136, 04/24 – TR153 <br />monitoring well SOM-38-H-1 in 1994, as it was lost (the casing was pinched, bent or blocked) in <br />1993, monitoring was successfully resumed in early 1995. Monitoring of wells SOM 38-H-2 and <br />SOM 38-H-3 were discontinued as the casing were apparently sheared by slide/subsidence activities <br />(see the 1989 AHR). These monitoring wells have been temporarily capped for potential future use <br />in monitoring the recovery of piezometric surface following the cessation of mining operations. <br />The steel casing of alluvial well SG-1 had rusted, was apparently bent, and no longer contained <br />water, so the well was deleted from the monitoring program in 1995 and replaced by well GB-1. <br />Due to construction on the east side of the LRP, GP-1 and GB-1 had to be abandoned and were <br />replaced with GP-6 and GP-7 in 1997. <br /> <br />Wells SOM-2H and SOM-16H are completed in the F-Seam and located in the Minnesota Creek <br />drainage basin, fairly close to the drainage divide. Monitoring of these wells will be continued to <br />provide assurance that mining is not having an impact on the Minnesota Creek basin. Additionally, <br />should Mountain Coal Company be fortunate enough to meet the potential production levels, these <br />wells are most likely to fall into the area of potential impact. For all other wells in the Minnesota <br />Creek drainage basin, monitoring will be discontinued until the summer before mining impacts can <br />be expected, at which time monitoring of those wells with a potential to be impacted in one year of <br />mining will be resumed. <br /> <br />Monitoring well JMB-12 was completed (see Exhibit 12) within the Jumbo Mountain tract (Map <br />34) to monitor the B-Seam in this area. Baseline data was obtained and was monitored during <br />mining, and subsequently removed from the monitoring program in 1998, because the bottom of the <br />well had been mined through with the B-Seam. <br /> <br />Monitoring wells 96-2-2 and 96-27-1 were completed above and in the E-Seam, respectively, <br />during the 1996 exploration project. Baseline data collection began in the fall of 1996. The wells <br />are now in the regular monitoring program as indicated on Table 5. <br /> <br />Drill hole 96-15-1 was drilled during the 1996 exploration program and was completed as a water <br />monitoring well in the B Seam. See Exhibit 12 for completion information. Because the well was <br />venting a significant amount of gas, water measurement and sampling is precluded. The well has <br />been fitted with a vent to allow de-gassing. In the event that the well discontinues producing gas, it <br />will be incorporated into the monitoring program. <br /> <br />Seasonal measurements (three times per year to correspond to the start of spring runoff, the peak <br />spring runoff, and the fall low flow) of water level, well water pH, conductivity, and temperature <br />will be taken for all monitored wells. For groundwater wells with less than five years of <br />monitoring data, annually, during the third sampling, a full-suite sample analysis consisting of <br />pH, conductivity, total dissolved solids (TDS) calcium, magnesium, sodium, SAR, hardness, <br />bicarbonate, chloride, un-ionized ammonia, nitrate/nitrite, phosphate (PO4-3 as P), sulfate, iron <br />(total and dissolved), manganese (total and dissolved), arsenic, cadmium, lead, mercury, <br />selenium, boron, and zinc. All parameters will be analyzed for their dissolved form unless stated <br />otherwise. Once five years of data has been accumulated the laboratory analysis will only <br />include TDS, pH, conductivity and iron (total and dissolved). A seasonal, rather than quarterly <br />or semi-annual well and water quality monitoring schedule was instituted for a variety of <br />reasons. The primary reason for selecting seasonal sampling is that, in the case of groundwater