Laserfiche WebLink
1. Move the super sacks and mining equipment from any lands not owned by <br /> the Operator and place them on lands that are owned by the Operator; <br /> 2. Grade the disturbed portion of the historic waste rock pile at the Gunnell <br /> Mine to a minimum 311:1V slope configuration for safety, limiting the <br /> total disturbance create by this grading work to the current disturbance <br /> footprint; <br /> 3. Within 90 days of the effective date of this Order, submit to the Division <br /> sufficient documentation demonstrating that these corrective actions have <br /> been completed. <br /> The Board ORDERS that the previously suspended civil penalties for Violation No. <br /> MV-2022-004, in the amount of$3,000.00 is due. Operator shall submit the <br /> $3,000.00 in civil penalties within 30 days of the effective date of this Order. <br /> DONE AND ORDERED this_431 day of_May 2024. <br /> FOR THE COLORADO MINED LAND <br /> RECLAMATION BOARD <br /> ell Wareha orris, Chair <br /> NOTICE OF JUDICIAL REVIEW RIGHTS <br /> This order becomes effective and final upon mailing. Any party adversely affected <br /> or aggrieved by agency action may commence an action for judicial review by filing <br /> a complaint with the district court within 35 days after the effective date of this <br /> order, pursuant to section 24-4-106, C.R.S. and the Colorado Rules of Civil <br /> Procedure. In the event that a complaint for judicial review is filed, designations of <br /> record made in accordance with section 24-4-106(6), C.R.S. should be served on the <br /> Board at: 1313 Sherman Street, Room 215, Denver, CO 80203, Attention: Camie <br /> Moj ar. <br /> Jack D. Tabb, LLC <br /> M-2021-068 <br /> MV-2024-001 4 <br />