Laserfiche WebLink
corresponds to the current period of mineral production with tailing deposition primarily in Mayflower TSF,but <br /> with the option for further deposition in the Tenmile Tailing Storage Facility (TSF). The second phase <br /> described herein is the Closure Scenario. <br /> Significant effort has been made in the preparation of this exhibit to present a system that is operationally and <br /> economically feasible. However, it is expected that refinements, improvements,and deviations will be made <br /> in the future to the system described herein. Depending upon the magnitude of these changes, and if <br /> appropriate, a technical revision (TR)will be prepared and submitted to DRMS for review and approval. <br /> Exhibit G G-2 May 2024 <br />