My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2024-05-17_REVISION - M1977493 (3)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1977493
>
2024-05-17_REVISION - M1977493 (3)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/30/2024 5:02:55 PM
Creation date
5/30/2024 5:04:53 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977493
IBM Index Class Name
Revision
Doc Date
5/17/2024
Doc Name
Exhibit I - Soil Information
From
Climax
To
DRMS
Type & Sequence
TR37
Email Name
TJ1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
66
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Permit M-1977-493—Climax Mine Technical Revision 37 (TR-37) <br /> Table 1-4: Soil Salvage and Replacement Volumes <br /> Reclamation Cover Reclamation Cover to Total Reclamation <br /> Salvaged (a) be Salvaged Onsite Cover Needed <br /> (CY) (CY) (Acres) (CY) <br /> 2 ft Thick(b) <br /> McNulty OSF 1,375,000 1,405,000 201 831,000 <br /> North OSF 235 760,000 <br /> Mayflower TSF(d) 784,100 1,965,000 686 1,705,900 <br /> Tenmile TSF 650 2,127,000 <br /> Robinson TSF lellfl 32,000 452 1,924,000 <br /> Robinson Lake Area 42 138,000 <br /> 1 Dam 127 410,000 <br /> 3 Dam 29 94,000 <br /> 5 Dam 61 197,000 <br /> Mill and Pit Area 126,000 236 778,000 <br /> Roads 112 365,000 <br /> Total 2,191,100 3,496,000 3,497 11,868,000 <br /> Notes: <br /> (a)Volume of estimated reclamation cover material salvaged as of March 2024. <br /> (b)3%of tailings surfaces will receive 4 feet of reclamation cover. Remaining impoundment area will receive 2 feet of cover. <br /> (°)Estimated reclamation cover salvaged includes volume from McNulty, North,and Area L Stockpiles. <br /> (d) Estimated reclamation cover salvaged includes volume from stockpiles 25 through 34. <br /> e Includes 380,000 CY of cover material required to fill decant pool area to closure design grade. <br /> ` Includes volumes from stockpiles 1 through 5 and 21 through 24. <br /> Exhibit 1 1-5 May 2010 <br />
The URL can be used to link to this page
Your browser does not support the video tag.