Laserfiche WebLink
Wild Horse Dams and Reservoir West Test Quarry DRMS 111 Application <br /> PROPOSED CRUSHING LAYOUT <br /> APPROXIMATE CRUSHING TOOTP -M <br /> 9 <br /> 11 �i,*_ 13 <br /> H E :.vim �.. „.....•• i -T <br /> • fi <br /> • <br /> o rn .,, <br /> .v. . i <br /> 111 <br /> .lci -..k,.. <br /> c,.,s...._______„..„) 3 P~ • <br /> 101111, <br /> 14 <br /> 15 n <br /> 1200F - — --+• <br /> NOT TO SCALE <br /> MEW a 500 KW GI%ERATO* <br /> I EORTANK(JAW CRUSHER 304S7 4 204 GAIION BAKER TANK <br /> I PORTABLE TRTPtM DECK SCREEN PLANT 6410 10.NATURAL FINES STOCKPILE <br /> 4.) <br /> 3.PORTABLE METSO 1T330GP TRACK CONE 11 311IN MINUS STOCRPKE <br /> 4 PORTABEE 6420 WET SCREEN'W/SAND SCREWS A ONBOARD DC WATERING 11/ONE 2 SAND STOCAPILE Wi I d H o rse <br /> S.PORTABLE VERTICACONVEYOR OLT MPACTOR 11.CONCRETEAG1 AGGREGATE <br /> RESERVOIR <br /> 6 PCIRtABIE CONVEYOR BlliS LOIN.:01T 11 CONCRETE AGGII(WTF STDCKPnt <br /> I PORTABLE RAENAL STAMP CONVEYOR TAN.100,1 15 TENWORARr-'1 SM GALLON POND W.ItNCE <br /> NOTE:AREA NEEDED FOR CRUSHING OPERATION Wlll RE•/-7 ACRES AND THE REMAINING•I-16 ACRES AS SHOWN ON ATTACHMENT"C'WILL BE USED FOR <br /> STAGING OF MATERIAL.WATER STORAGE POND,AND PAINING- _.S'JJI 0Ev,C' v,'S,ATSO%UM 4 yLl 5OLMA LIC <br /> Figure 3-1:Proposed Potential Crushing Layout <br /> 3.2.13 Commodities <br /> 6.3.3(n) identify the primary and secondary commodities to be mined/extracted and describe the intended use. <br /> The proposed Wild Horse Project requires large quantities of high-quality sand, gravel, and large rock to build the <br /> proposed dams and associated assets. Geological mapping, recent site-specific gravity geophysical surveys, <br /> exploratory holes, and visual inspections indicate that high-quality granite, suitable for crushing and processing, <br /> is expected to outcrop and underlie the request areas. <br /> 3.2.14 Product Use <br /> 6.3.3(o) name and describe the intended use of all expected incidental products to be mined/extracted by the <br /> proposed operation. <br /> The purpose of the test quarry sections is to determine the feasibility of producing rock-sourced material from the <br /> Wild Horse Reservoir Project site and to determine the suitability of the material produced for use within the <br /> proposed dam, pipeline, and road infrastructure. The product use of the test quarry sections will be primarily for <br /> testing to verify suitability. <br /> Tetra Tech May 2024 16 <br />