My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2024-05-24_REVISION - M1977321
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1977321
>
2024-05-24_REVISION - M1977321
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/12/2024 7:56:33 AM
Creation date
5/28/2024 10:10:32 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977321
IBM Index Class Name
Revision
Doc Date
5/24/2024
Doc Name
Notice of Surety Increase
From
DRMS
To
Summit Brick & Tile Co - Julie Welte
Type & Sequence
SI2
Email Name
JLC
AME
SMS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
31
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Scraper Worksheet Cont'd Task#001 Page 2 of 2 <br /> Payload Capacity: 28.14 LCY Adjusted Capacity: 28.14 LCY <br /> Cycle Time: <br /> Scraper Loading Time: 0.80 Minutes <br /> Maneuver and Spread Time: 0.60 Minutes <br /> Job Condition Correction: Site Altitude: 4500 feet <br /> Scraper Push Dozer Source <br /> Altitude Ad': 1.000 1.000 (CAT HB) <br /> Job Efficiency: 0.830 0.830 (CAT HB) <br /> Net Correction: 0.830 0.830 <br /> Travel Time: <br /> Road Condition: Firm, smooth,rolling,dirt/It. surfaced,watered,maintained 3.0 <br /> Haul Route: <br /> Seg# Haul Distance(Ft) Grade Roll. Res Total Res Velocity(fpm) Travel Time <br /> (%) (%) (%) (min) <br /> 1 700.00 2.00 3.00 5.00 1867 0.51 <br /> Haul Time: 0.51 minutes <br /> Return Route: <br /> Seg# Haul Distance(Ft) Grade Roll. Res Total Res Velocity(fpm) Travel Time <br /> (%) (%) (%) (min) <br /> 1 700.00 -2.00 3.00 1.00 2963 0.35 <br /> Return Time: 0.35 minutes <br /> Total Scraper team cycle time: 2.26 minutes <br /> Adjusted for job conditions: 620.03 LCY/Hour <br /> Selected Number of Scrapers: 9 Scraper(s) <br /> Adjusted single scraper team(unit)hourly production: 5,580.27 LCY/Hour <br /> Adjusted multiple scraper team(fleet)hourly production: 5,580.27 LCY/Hour <br /> Unadjusted unit production/hour: 747.02 LCY/Hour <br /> Optimal Number of Scrapers per push dozer: <br /> JOB TIME AND COST <br /> Fleet size: 1 Team(s) Total job time: 24.73 Hours <br /> Unit cost: $1.035 /LCY Total job cost: $142,867 <br /> CIRCES Cost Estimating Software <br />
The URL can be used to link to this page
Your browser does not support the video tag.