Laserfiche WebLink
COST SUMMARY WORK <br /> Task description: <br /> St.Barbara Sand and Gravel Permit Action: <br /> Site: Mine 2024Inspection Permit/Job#: M2004013 <br /> PROJECT IDENTIFICATION <br /> Task#: 000 State: Colorado Abbreviation: None <br /> Date: 3/18/2024 County: Pueblo Filename: MO13-000 <br /> User: JLC <br /> Agency or organization name: DRMS <br /> TASK LIST (DIRECT COSTS) <br /> Task Form Fleet Task <br /> Description Used Size Hours Cost <br /> 001 Fill 5.7 acre Pit Area SCRAPERl 1 24.73 $142,867 <br /> 002 Fill Process Ponds SCRAPERl 1 22.05 $127,382 <br /> 003 Replace Topsoil 7-in on 95 acres SCRAPERl 1 19.50 $113,379 <br /> 004 Reveg 95 Acres REVEGE 1 48.00 $224,263 <br /> 005 Mob/Demob MOBILIZE 1 3.33 $16,754 <br /> SUBTOTALS: 117.61 $624,645 <br /> INDIRECT COSTS <br /> OVERHEAD AND PROFIT: <br /> Liability insurance: 2.02 Total= $12,618 <br /> Performance bond: 1.05 Total= $6,559 <br /> Job superintendent: 52.30 Total= $3,404 <br /> Profit: 0.00 Total= $0 <br /> TOTAL O&P= $22,580 <br /> CONTRACT AMOUNT(direct+O&P)= $647,225 <br /> LEGAL-ENGINEERING-PROJECT MANAGEMENT: <br /> Financial warranty processing(legal/related costs): $500 Total= $500 <br /> Engineering work and/or contract/bid preparation: 4.25 Total= $27,507 <br /> Reclamation management and/or administration: 5.00 $32,361 <br /> CONTINGENCY: 0.00 Total= $0 <br /> TOTAL INDIRECT COST= $82,949 <br /> TOTAL BOND AMOUNT(direct+indirect)= $707,594 <br />