My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2024-05-24_REVISION - M1977321
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1977321
>
2024-05-24_REVISION - M1977321
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/12/2024 7:56:33 AM
Creation date
5/28/2024 10:10:32 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977321
IBM Index Class Name
Revision
Doc Date
5/24/2024
Doc Name
Notice of Surety Increase
From
DRMS
To
Summit Brick & Tile Co - Julie Welte
Type & Sequence
SI2
Email Name
JLC
AME
SMS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
31
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page 1 of 2 <br /> EQUIPMENT MOBILIZATION/DEMOBILIZATION <br /> Task description: Mob/Demob <br /> Site: Native/Pierre Mine Permit Action: 2024 Inspection Permit/Job#: M1977321 <br /> PROJECT IDENTIFICATION <br /> Task#: 006 State: Colorado Abbreviation: None <br /> Date: 4/5/2024 County: Pueblo Filename: M321-006 <br /> User: JLC <br /> Agency or organization name: DRMS <br /> EQUIPMENT TRANSPORT RIG COST <br /> Shift basis: 1 per day <br /> Cost Data Source: CRG Data <br /> Truck Tractor Description: GENERIC ON-HIGHWAY TRUCK TRACTOR,6X4,DIESEL POWERED, <br /> 400 HP(2ND HALF, 2006) <br /> Truck Trailer Description: GENERIC FOLDING GOOSENECK,DROP DECK EQUIPMENT <br /> TRAILER(25T, 50T,AND 100T) <br /> Cost Breakdown: <br /> Available Rig Capacities 0-25 Tons 26-50 Tons 51+Tons <br /> Ownership Cost/Hour: $20.26 $36.04 $47.05 <br /> Operating Cost/Hour: $39.51 $76.08 $82.85 <br /> Operator Cost/Hour: $22.52 $22.52 $22.52 <br /> Helper Cost/Hour: $0.00 $23.53 $23.53 <br /> Total Unit Cost/Hour: $82.29 $158.17 $175.95 <br /> NON ROADABLE EQUIPMENT. <br /> Machine Weight/ Owner ship Haul Rig Fleet Haul Trip Return Trip DOT Permit <br /> Description Unit Cost/hr/unit Cost/hr/uni Size Cost/hr/ Cost/hr/fleet Cost/fleet <br /> (TONS) t fleet <br /> Cat D7R DS XR 32.01 $114.76 $158.17 2 $545.86 $316.34 $250.00 <br /> Series II <br /> Drill/Broadcast 25.00 $6.73 $82.29 1 $89.02 $82.29 $250.00 <br /> Seeder with <br /> Tractor <br /> Cat 627G w/push- 43.48 $249.04 $158.17 2 $814.42 $316.34 $500.00 <br /> pull <br /> CAT 120M 15.53 $85.55 $82.29 1 $167.84 $82.29 $250.00 <br /> Subtotals: $1,617.14 $797.26 $1,250.00 <br /> ROADABLE EQUIPMENT: <br /> Machine Description Total Cost/hr/ Fleet Size Haul Trip Return Trip <br /> unit Cost/hr/fleet Cost/hr/fleet <br /> Light Duty Pickup,4x4,1 T. $27.44 1 $27.44 $27.44 <br /> Crew <br /> Water Tanker,7,000 Gal. $228.29 1 $228.29 $228.29 <br /> Subtotals: $255.73 $255.73 <br /> CIRCES Cost Estimating Software <br />
The URL can be used to link to this page
Your browser does not support the video tag.