Laserfiche WebLink
St.JUM Mine TR No.3 <br /> Prior to construction,the compressor pad area will be protected from potential stmo water run-on <br /> by constructing a one-foot high earth bens on the upslope side of the construction area. This <br /> material will be harrowed from the existing waste rock material that makes-up the surface of the <br /> mine bench surface facility. <br /> 4.0 Reclamation <br /> Reclamation of the compressor pad will include the following procedures: <br /> 1. Disconnect all power to the compressor equipment and removal of all equipment <br /> (compressors and associated piping,air tanks, and canopy structure)to an offsite location <br /> for salvage, reuse, or proper disposal. <br /> 2. The concrete pad will be broken up in place and hauled into the mine workings for <br /> disposal. <br /> 3. The electrical power cable will be excavated,removed from the site,recycled or <br /> repurposed, or otherwise disposed of properly. <br /> 4. Reclamation of the mine site will proceed as described in Exhibit E of the mine permit, <br /> including closure/plugging of the mine portal,recontouring of the affected area to better <br /> blend with surrounding grade,placement of topsoil where applicable, and seeding with <br /> USBLM-approved seed mix. <br /> Weetem Water& Land, Ine. 3 <br />