My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2024-05-17_REVISION - C1981010 (2)
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1981010
>
2024-05-17_REVISION - C1981010 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/20/2024 8:28:06 AM
Creation date
5/20/2024 8:18:01 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981010
IBM Index Class Name
Revision
Doc Date
5/17/2024
Doc Name
Adequacy Review Response
From
Trapper Mining Inc
To
DRMS
Type & Sequence
SL25
Email Name
RAR
JLE
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page 12 <br /> 3.The following illustration highlights a parcel that is unidentifiable to DRMS as it lands on the seam between <br /> the two map sheets. Please clarify the parcel nomenclature on Map sheet land associated acres with a revised <br /> map,possibly utilizing a call out block for visibility. <br /> t <br /> 04243 <br /> tee« <br /> . t1 <br /> 7967 <br /> '30.1a( <br /> l884 <br /> T£UPC'RARIL) <br /> SEEOEP 1�... <br /> REGRADED ''. 1iN <br /> SPO(L$ .7.-:7.41 <br /> f�" <br /> 1 l' ' ; <br /> Trapper Response: This parcel labeled a remnant parcel of Phase III release to the east of this label on Sheet 2 <br /> of the Map 1. The map has been revised with better label placement. <br /> 4. Please describe the reason for the cutout of parcel DAB23. <br /> Trapper Response: The cutout in the southern portion of the parcel is to exclude the active topsoil pile to be <br /> utilized at a later date. Topsoil piles are typically not included within the Phase I parcel boundary. Acres are <br /> also excluded from D-AB-23 for piles D-97-1 and D-97-1A despite their location within the parcel. <br /> 5. Please address the backfilling, grading and topsoiling timeline of this cutout and the plan for utilization of <br /> the E79-6 22B topsoil pile. <br /> a1ea <br /> r'?ryl ,. `7+ <br /> TEMPORM LY" <br /> SUMP <br /> 7lEGRA2)ED <br /> SPOILS <br /> Trapper Response: As stated above, this is the actual outline of the topsoil pile area, it will be utilized to fill <br /> this cutout and areas to the north ()fit in the summer of 2024. <br /> Rule 3.03.2(1)(b)(c)Publication <br /> DRMS notes that the newspaper publication as presented in the application references the publication <br /> associated with the SL24 application as to the dates published,the type of phased bond release and <br /> the description of the specific location of the parcels requested for release. <br />
The URL can be used to link to this page
Your browser does not support the video tag.