My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2024-05-14_PERMIT FILE - C1980007A (2)
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C1980007
>
2024-05-14_PERMIT FILE - C1980007A (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/6/2024 7:59:15 AM
Creation date
5/14/2024 1:06:32 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1980007A
IBM Index Class Name
Permit File
Doc Date
5/14/2024
Doc Name
2.05-15 Thru 2.05-49
Section_Exhibit Name
2.05.3 Operation Plan - Permit Area
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
36
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
West Elk Mine <br /> <br />2.05-26 Rev. 06/05, 01/06, 03/06, 04/06 & 05/06- PR10; 01/09- MR350; 04/09- TR116; 04/09- MR353; 05/09- MR354; 08/09- TR118; <br />08/09- TR119; 09/12- MR387; 11/12- MR390; 07/18-PR15; 11/18- MR430; MR438- 09/19; MR439- 11/19; 07/20- MR447; 6/22- <br />MR464; 6/22 MR466; 6/22 MR468; 11/22 MR471; 07/23 MR474; 8/23 MR476; 09/23 MR477, 10/23 MR478, MR479, 3/24 MR480, <br />05/24 MR-481 <br />Portions of the Lower Refuse Pile (LRP) are sited within 100 feet of the relocated State Highway <br />133. MCC applied to the CDOT for approval to conduct operations within 100 feet of State <br />Highway 133. CDOT granted approval for operations within 100 feet of State Highway 133 on <br />April 8, 1986. <br />In 1997, MCC constructed the Refuse Pile Expansion (RPE) area. The RPE and the associated <br />north soil storage area are within 100 feet of the CDOT right-of-way. MCC received an approval <br />letter from CDOT to locate operations within this area that is included in Exhibit 70, Appendix C. <br /> <br />Railroads <br /> <br />The West Elk Mine area is served by the Union Pacific Railroad Company (UP). A 6,000-foot long <br />railroad siding and a small auxiliary siding, constructed within the right-of-way of the UP railroad, <br />serves the loadout facility (owned and controlled by UP). <br /> <br />Access Control <br /> <br />Access to the West Elk Mine is controlled with electronic security gates at the silo pad entrance and <br />the main mine site entrance off State Highway 133. To enter into the mine site, the gates are <br />controlled by an electronic card reader. To exit the mine site, an electronic “exit loop” will activate <br />the gates. A phone was installed at the main mine site gate for visitors. Locked manual gates <br />control other entrances to the disturbed area (i.e. Lone Pine Gulch, the North Soil Storage Area, and <br />the Refuse Pile Expansion). The old highway access gate also consists of 31 concrete barriers to <br />assist in controlling mine access as well as sediment control, for any storm events over the <br />10yr/24hr events. The barriers are 2’x2’x6’ in size and are stacked two barriers high. Security <br />monitoring of the mine area occurs as necessary. <br /> <br />In addition to fences and security monitoring, signs are used to control access to the permit area and <br />facilities within the area. Signs identifying the mine area are displayed at all points of access from <br />public roads and highways. These signs show the name, business address, and telephone number of <br />the Permittee and identification numbers of current mining and reclamation permits or other <br />authorizations to operate. Although not required (see MR-366), permit boundary signs are present <br />along the perimeter of the disturbed mine site where natural or constructed features do not provide <br />boundary demarcations. Topsoil stockpiles, subsoil stockpiles, and the refuse area are clearly <br />marked with material identification signs. <br /> <br />Soil Stockpiles <br /> <br />As West Elk Mine is an underground mine and most of the reclamation will not begin until the end of the <br />life of the mine, it is necessary to have subsoil and topsoil stockpiles. The main topsoil pile is located to <br />the south of the run-of-mine coal stack-pad and will be used for reclamation of the main mine facilities <br />area. Some subsoil from the subsoil pile in Sylvester Gulch, (Live Subsoil Pile #1) as well as the topsoil <br />from the stockpile at the North Soil Storage Area (NSSA), will be used for reclamation of the Lower <br />Refuse Pile. MCC has also stockpiled topsoil from the Refuse Pile Expansion (RPE) area and the <br />widening of the mine entrance at the NSSA on the north side of Highway 133. <br /> <br /> <br />Landslide Corrective Measures
The URL can be used to link to this page
Your browser does not support the video tag.