Laserfiche WebLink
NCCI Pit #1 Substitute Water Supply Plan - Amendment Page 3 of 4 <br /> May 9, 2024 <br /> structure/reservoir from any source, including precipitation, must be released without use. <br /> 5. The Applicant shall provide daily accounting (including, but not limited to diversions, depletions, <br /> replacement sources, and river calls) on a monthly basis. The accounting must be uploaded to the CDSS <br /> Online Reporting Tool within 30 days of the end of the month for which the accounting applies <br /> (https://dwr.state.co.us/Tools/reporting). Instructions for using the tool are available on the Division <br /> of Water Resources website on the "Services" —> "Data St Information" page under the heading of Online <br /> Data Submittal DWR's website under Services / Data and Information in the Online Data Submittal <br /> Section. Accounting and reporting procedures are subject to approval and modification by the division <br /> engineer. Accounting forms need to identify the WDID number for each structure operating under this <br /> SWSP. Additional information regarding accounting requirements can be found in the attached <br /> Augmentation Plan Accounting Administration Protocol for Division One. NOTE: Monthly accounting, <br /> even during the winter non-irrigation season, is required. <br /> In addition, the Applicant shall verify that the entity making replacement for this SWSP is including that <br /> use on their monthly accounting submitted to this office. For the purposes of this SWSP, that entity is <br /> the City of Thornton (WDID 0202611). <br /> 6. Applicant should refer to the Augmentation Plan Accounting Administration Protocol for the operation <br /> of this SWSP. <br /> 7. Conveyance loss for delivery of augmentation water is subject to assessment and modification as <br /> determined by the Division Engineer. Currently 0.5% per mile conveyance loss is being accounted for <br /> in the SWSP; this is subject to change depending upon current conditions. <br /> 8. Replacement water must be made available to replace all out-of-priority depletions in time, place, and <br /> amount and must be made available under the direction and/or approval of the water commissioner. <br /> 9. All releases of replacement water must be sufficient to cover all out of priority depletions and be made <br /> under the direction and/or approval of the Water Commissioner. The replacement may be aggregated <br /> to maximize beneficial use. The Water Commissioner and/or Division Engineer shall determine the rate <br /> and timing of an aggregated release. <br /> 10. In order to prevent injury to other water rights, the division engineer and water commissioner must be <br /> able to administer Applicants' replacement water past headgates on the river at times when those <br /> headgates would otherwise be legally entitled to divert all available flow in or "sweep" the South Platte <br /> River or its tributaries. Applicant shall not receive credit for replacement of depletions to the South <br /> Platte River below such diversion structures unless bypass and measurement structures are in place to <br /> allow the division engineer and water commissioner to confirm that Applicant's replacement water is <br /> delivered past the headgates. In the event that delivery past dry-up points requires the use of a <br /> structure for which a carriage or use agreement with a third party is required, Applicant shall be <br /> responsible for securing such agreement. Until such time as the Applicant provides a copy of the <br /> carriage or use agreement to the division engineer and water commissioner, no credit will be allowed <br /> for replacement of depletions to the South Platte River below such diversion structure. <br /> 11. The Division of Water Resources will not be responsible for any enforcement or administration of third <br /> party agreements that are not included in a decree of the water court. <br /> 12. The name, mailing address, and phone number of the contact person who will be responsible for <br /> operation and accounting of this plan must be provided on the accounting forms to the Division Engineer <br /> and Water Commissioner. <br /> 13. The approval of this SWSP does not relieve the Applicant and/or landowner of the requirement to obtain <br /> a Water Court decree approving a permanent plan for augmentation or mitigation to ensure the <br />