Laserfiche WebLink
6.4.12 Exhibit L — Reclamation Costs <br /> Reclamation Costs are estimated as follows: <br /> DIRECT COSTS <br /> Item Task Description Area Volume Cost Extension <br /> [acres] [yd3] [$Q [$] <br /> 1 Dewater Pond 1 8 $65.67 $525.36 <br /> 2 Backfill Pond 1 13,000 $1.00 $13,000.00 <br /> 3 Dewater Pond 2 18 $65.67 $1,178.78 <br /> 4 Backfill Pond 2 29,000 $1.50 $43,500.00 <br /> 5 Topsoil Replacement 11.7 acres @ 8" Depth 6,218 $0.58 $3,606.44 <br /> 6 Revegetate Disturbed Area 34 $550.00 $18,584.50 <br /> 7 Mobilization/Demobilization $2,000.00 $1,000.00 <br /> 8 Total Direct Costs $81,395.08 <br /> Kirtright Pit(M1986-123) Amendment Application <br /> Specific Exhibits <br /> Page 17 of 26 <br />