Laserfiche WebLink
5. Describe proposed surface excavation or other land disturbance, including roads, pits, <br /> trenches,waste piles, drill pads and collar areas of underground workings,ponds, etc. <br /> Equipment : truck mounted drill , skid steer for road repair and clean up, Pick up truck for support vehicle. <br /> Description of work:Two track trails in open areas and on existing roads, witn repair of washed areas <br /> preventing access. Total road repair with blade disturbance will be less than 10 feet by 100 feet <br /> cumulative, 1,000sq. feet total Drill pads will be smoothed with minimal topsoil disturbance 10feet by ten <br /> feet=100sq. feet. X20 pads =2,000sq feet. Total disturbance roads and pads = 3,000 sq feet. Drill pads <br /> will have tarp laid out over area with metal plates or tubs to catch cuttings. <br /> Clean up: Drill cuttings will be gathered and returned into dry hole. Excess drill cuttings will be taken to the <br /> Prince Albert mine site to be used for underground roadways. <br /> No water has been encountered in previous drilling. <br /> Radioactive ore samples will be taken to the Prince Albert Mine site and handled as ore to be shipped. <br /> 6. Proposed Disturbance (approximate) Describe the proposed drilling to be conducted, <br /> including anticipated number of holes, diameter, depth, location, etc. Submit additional <br /> pages if necessary: <br /> A. Drill Pads: <br /> Average Average <br /> Quantity 40 Width (ft) 2 Length (ft) 2 <br /> B. Drill Holes: <br /> Diameter <br /> Quantity 40 Depth (ft) 250 (in) 5 <br /> C. Mud Pits <br /> Average Average Average <br /> Quantity 1 Width (ft) 5 Length (ft) 10 Depth (ft) 2.0 <br /> D. Described proposed underground work, including reopening of old workings, <br /> advancement of adits or shafts, trenches, pits, cuts, rock dumps, or other types of <br /> disturbance, describe type, quantity and general dimensions: <br /> NA <br /> Form 2—Public File Page 6 of 14 <br />