Laserfiche WebLink
3. Describe the estimated topsoil depth and how topsoil will be salvaged, stockpiled and <br /> redistributed for the re-establishment of vegetation. Specify approximate topsoil <br /> redistribution depth: <br /> A shovel and bucket will be used to salvage topsoil in the path of the vertical drill hole <br /> to a depth of 6 inches. I he topsoil disturbance will be less than 1 foot in diameter. I he <br /> tarp covering will protect the topsoil in the immediate area from drill cuttings <br /> contamination. <br /> - . , .•-• •• •' ,,' •- ".f. • ' • - •• • - • • - - 111111•• • <br /> complete. The seeding will occur from natural surrounding native plants. <br /> 4. Describe how drill holes will be plugged (refer to Rule 5.4 of the Rules for required <br /> abandonment procedures): <br /> drill cuttings will be used to fill abandoned holes to within ten feet of surface. concrete <br /> mix will then be used to create permanent plug in hole to within three feet, then hole will <br /> be filled with available soil. <br /> 5. Describe how portals, adits, shafts, ponds, excavations, or other disturbances will be <br /> reclaimed (refer to Rule 3 and Rule 5 for specific reclamation performance standards). <br /> You may wish to contact the Division for closure specifications. <br /> NA <br /> Form 2—Public File Page 9 of 14 <br />