Laserfiche WebLink
EXHIBIT S <br /> Permanent Man-Made Structures within 200 Feet of the Affected Land <br /> The applicant, Connell Resources, Inc., believes that the mining operation, as proposed, will not <br /> adversely affect any of the permanent, man-made structures located within 200 feet of the affected <br /> area. Mining highwalls will remain at least three times the pit depth from the proposed permit <br /> boundary and ground beyond the permit boundary will remain stable. Since all mining and <br /> reclamation activities will be performed within the permit boundary, no impacts to man-made <br /> structures outside the permit boundary are anticipated. <br /> A list of observed and recorded man-made structures within 200 feet of the proposed permit <br /> boundary, organized by land parcel where the structure was observed, is provided below. <br /> Although mining has mainly been completed within the permit area, structure agreements will be <br /> offered to all property and permanent, man-made structure owners located within 200 feet of the <br /> affect area. For Phase 3, where future active mining could be within 200 feet of the permit boundary <br /> adjacent to Weitzel Road, structure agreements have already been obtained from property and <br /> structure owners. Copies of the structure agreements are attached. <br /> Timnath Connell Pit <br /> DRMS 112 Permit Amendment Application Page 33 <br />