Laserfiche WebLink
-6- <br /> ��2. The Board may suspend or revoke this permit,or assess a civil penalty, upon a finding that the permittee <br /> violated the terms or conditions of this permit, the Act, the Mineral Rules and Regulations,or that information <br /> contained in the application or your permit misrepresent important material facts; <br /> 0--....'/V 3. If your mining and reclamation operations affect areas beyond the boundaries of an approved permit <br /> boundary,substantial civil penalties, to you as permittee can result; <br /> e..---• 4. Any modification to the approved mining and reclamation plan from those described in your approved <br /> application requires you to submit a permit modification and obtain approval from the Board or Office; <br /> 0.. .. 5. It is your responsibility to notify the Office of any changes in your address or phone number; <br /> 06. Upon permit issuance and prior to beginning on-site mining activity,you must post a sign at the entrance of <br /> the mine site,which shall be clearly visible from the access road,with the following information(Rule 3.1.12): <br /> a. the name of the operator; <br /> b. a statement that a reclamation permit for the operation has been issued by the Colorado Mined Land <br /> Reclamation Board; and, <br /> c. the permit number. <br /> 0/ 7. The boundaries of the permit boundary arca must be marked by monuments or other markers that arc clearly <br /> visible and adequate to delineate such boundaries prior to site disturbance. <br /> e78. It is a provision of this permit that the operations will be conducted in accordance with the terms and <br /> J conditions listed in your application,as well as with the provisions of the Act and the Construction Material Rules <br /> and Regulations in effect at the time the permit is issued. <br /> OZ9. Annually,on the anniversary date of permit issuance,you must submit an annual fcc as specified by Statute, <br /> and an annual report which includes a map describing the acreage affected and the acreage reclaimed to date(if <br /> there are changes from the previous year), any monitoring required by the Reclamation Plan to be submitted <br /> annually on the anniversary date of the permit approval. Annual fees are for the previous year a permit is held. For <br /> example,a permit with the anniversary date ofJuly 1, 1995,the annual fee is for the period ofJuly 1, 1994 through <br /> June 30, 1995. Failure to submit your annual fee and report by the permit anniversary date may result in a civil <br /> penalty, revocation of your permit, and forfeiture of your financial warranty. It is your responsibility, as the <br /> permittee,to continue to pay your annual fee to the Office until the Board releases you from your total reclamation <br /> responsibility. <br /> AN 10. For joint venture/partnership operators: the signing representative is authorized to sign this document and a <br /> power of attorney(provided by the partner(s)) authorizing the signature of the representative is attached to this <br /> application. <br />