Laserfiche WebLink
GBEA Wagner Pit#M2023038,Owner&Operator:Twin Buttes Land Co LLC 04/22/2024,Page 35 of 65 <br /> Road Dimensions (g) <br /> As previously stated there are 1640 ft of roads within the pit boundaries. The roads are <br /> unimproved and of the native soil and rock. A description of what is commonly called a <br /> "two-track" road fits well (30 ft wide). Roads are not graveled or hardened. If <br /> conditions warrant, the roads will be hardened with material from the pit ( e.g., <br /> operating during wet conditions). <br /> ific <br /> .... .,„,„.:_,. ..,. ., .„ ..,, . .. , <br /> ..., v. . _ ........,„:„.., .. ,..F .: <br /> _.,...40,04,04,--.: . , ,.,:: ,. ,,, , , , .. , . . .;,...,, . . _ ,... ,... <br /> .. ,. . .. _ <br /> ,..,.... ,,;.., , ,,.. ,. _ „.... . ..A„. . <br /> -v <br /> .... ., ..., ... , ‘. _ . ..:,.,,.....,. <br /> ...„.„,,,..:, ..,„ . - ...„ ... 41,44,, ',..41‘ .":" <br /> .30;t,' -,'•;• I''. <br /> fa A 1 .r l:' ` r r r .,ayte' "-,Yi 1. <br /> _ Fes'• 4.4qt• <br /> Wagner Pit <br /> Unimproved Road(left) <br /> ' Doter Access(center) <br /> ` - Feb 27,2024 <br /> GgfA <br /> Photo C-7. Typical two-track on the left with dozer access for mining in the center. <br /> There are no culverts, shoulders, or waterways associated with roads within the pit <br /> boundaries. <br /> Water Usage (h) <br /> There is no plan to utilize any on location water sources for the mining operation. <br /> Surface Water and Runoff(i) <br /> Water does have the potential to move across the pit during heavy summer monsoon <br /> rains. On the north side, slightly outside of the pit boundary, there are dirt berms that <br /> have been built to prevent water from flowing onto the multipurpose flat (Map C-1). At <br /> the base of the High Wall there is a depression that will retain runoff from the top of the <br /> High Wall. The depression dries quickly after the rains stop. <br /> There should be no ground water encountered or utilized. <br /> Water Rights (j) <br /> There are water rights on West Douglas Creek and East Douglas Creek but given that <br /> there is no water usage from West Creek or other sources, there will be no impact. <br /> Water rights are located 5-6+ miles (Highway 139 mi. ) up and downstream from the pit. <br /> See Map Appendix C-2 on page C-18 in Appendix C. <br />