Laserfiche WebLink
VOLUME II -E <br />LIST OF EXHIBITS <br />42A EMD Alluvial Valley Floor Determination <br />43 U.S. Fish and Wildlife Service: Windy Gap Process <br />44 Consolidated with Exhibit 30 <br />45 Fish Creek AVS/Stream Study: Hydrologic Analysis (Confidential Appendix) <br />46 Fish Creek AVS/Stream Study: Vegetation Analysis <br />47 Ownership and Control Information Update <br />47A Prior Affiliation History for Nicholas P. Moros, Vice President <br />47B Prior Affiliation History for Garold R. Spindler, Senior Vice President <br />47C Prior Affiliation History for Susan E. Chetlin, Assistant Secretary <br />47D Prior Affiliation History for Kevin S. Crutchfield, Senior Vice President, Midwest Region <br />47E Prior Affiliation History for Thomas V. Falkie, Director <br />47F Prior Affiliation History for Pat Panzarino, VP, Sales & Marketing <br />48 Haul Road for Batchway <br />48-1 Batch Weigh Loadout Haul Road, Alternative Gravel Section/Construction Recommendations <br />48-2 Batch Weigh Loadout Haul Road, Modified Gravel Section/Construction Recommendations <br />48-3 Main Entrance Road and Parking Lot, Pavement Recommendations <br />49A 6 -North Mains Intake Shaft — Design Drawings <br />49B Bathhouse Expansion Design Drawings <br />49C 18 -Right Escape Hoist Foundation Drawings <br />49D Conveyor Support Structure and Foundation Drawings <br />49E 6 -North Mains Substation Design Drawings and Materials List <br />49F Pumphouse Addition Design Drawings and Contractor Specifications <br />49G EC System Design Drawings and Contractor Specs and Flocculant System Information <br />49H Truck Loadout Design Drawings <br />49I Temporary Haulroad C-1 Profile and Typical Cross -Section <br />49J Haulroad A — Design Information <br />RN17-07 xi 02/15/18 <br />