Laserfiche WebLink
<br /> <br /> <br />TABLE 49A <br />Soil Stockpile Summary <br />STOCKPILE ID <br /> <br />CURRENT VOLUME <br />(CY) <br />VOLUME TO BE ADDED <br />(CY) <br />TOTAL VOLUME <br />(CY) <br />FCB-1 7,400 0 7,400 <br />FCB-2 350 0 350 <br />FCB-3 150 0 150 <br />FCVF-1 350 0 350 <br />SSS-1 2,000 0 2,000 <br />RDT-1 800 0 800 <br />WWTF-1 4,000 0 4,000 <br />SF-1 54,850 0 54,850 <br />SF-2 55,850 0 55,850 <br />SF-3 109,400 300 109,700 <br />SF-4 3,650 0 3,650 <br />SF-5 700 1,450 2,150 <br />SF-6 152,750 450 153,200 <br />SF-7 38,700 0 38,700 <br />SF-8 4,100 0 4,100 <br />SF-9 5,800 0 5,800 <br />SF-10 350 0 350 <br />SF-11 100 0 100 <br />SPSP-1 6,300 100 6,400 <br />SPSP-2 4,150 0 4,150 <br />SF-12,13,14 (1) 20,000 0 20,000 <br />SF-15 0 800 800 <br />SF-16 0 2,200 2,200 <br />SF-17 0 900 900 <br />CRDA-S1 and S2 131,800 185,400(2) 317,200(2) <br />TOTAL 603,550 191,600 795,150 <br />EASTERN AND NORTHERN MINING DISTRICTS <br />10RT Dewatering Borehole 7,200 250 7,450 <br />10RT Dewatering Treatment <br />Pond (includes access road) <br />0 6,300 6,300 <br />EMD Ventilation Site 4,750 0 4,750 <br />7 North Escape Shaft 2,200 0 2,200 <br />MC Shop to FC Tipple 12,800 0 12,800 <br />NMD Power Borehole & <br />Road <br />0 5,700 5,700 <br />Ventilation Shaft & Road 0 2,550 2,550 <br />18RT Shaft & Road(3) 0 6,600 6,600 <br />6MN Shaft, Road, & <br />Reservoir(4) <br />0 23,700 23,700 <br />19RT Borehole/Pipeline 0 6,050 6,050 <br />5MN Cement Borehole 0 6,550 6,550 <br />TOTAL 26,950 57,700 84,650 <br />WESTERN MINING DISTRICT <br />18Lft Shaft & Road 0 13,550 13,550 <br />WMD Stab. Borehole 0 2,600 2,600 <br />17LT Rockdust Install. 0 4,000 4,000 <br />15LT Vent Shaft 0 5,600 5,600 <br />16LT Utility Borehole 0 10,900 10,900 <br />13LT Utility Borehole 0 8,230 8,230 <br />TOTAL 0 44,880 44,880 <br />WOLF CREEK RESERVE <br />9E and 10E Boreholes 0 13,780 13,780 <br />7 East Cross Entries 0 7,500 7,500 <br />WC Mains Borehole 0 2,970 2,970 <br />6E Utility Borehole 0 1,770 1,770 <br />TOTAL 0 21,280 21,280 <br /> <br />(1) Soil from Stockpiles SF-12 and 13 has been relocated to Stockpiles CRDA – S1 and S2 <br />(2) For CRDA S1 and S2, the volume to be added will be direct handled or placed in a future stockpile(s) <br />(3) The volume listed for the 18RT Shaft/Roads is split among four stockpiles, roughly 40/30/15/15 percent beginning at the shaft pad and <br />running back along the access road to the stock-pond location. Locations are shown on Map 29. <br />(4) The volume listed for the 6MN Shaft, Roads, and Reservoir is split among four stockpiles, roughly 40/30/15/15 percent, beginning at the <br />shaft pad stockpile and running back along the access road to the NW Mains Vent Shaft. Locations are shown on Map 29.