2024-04-25_PERMIT FILE - C1982056A (2)
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C1982056
>
2024-04-25_PERMIT FILE - C1982056A (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/29/2024 3:19:32 PM
Creation date
4/29/2024 2:55:14 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1982056A
IBM Index Class Name
Permit File
Doc Date
4/25/2024
Doc Name
Pages 2.05-65 to 2.05-197.3 part 2
Section_Exhibit Name
2.05 Operation and Reclamation Plans Part 2
Media Type
D
Archive
Yes
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
242
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
TR21‐97 2.05‐84.11a 06/29/21 <br />test pit excavation/soils boring, and backfilling and leveling of the resultant small area/auger-hole, occurs in a <br />continuous sequence within the course of less than two hours for each location). The geotechnical investigation <br />activities do not involve the use of water and are conducted under dry conditions, so the potential for related <br />hydrologic impacts is negligible. All geotechnical disturbance is reseeded by broadcast seeding within 6-months of <br />disturbance, although natural revegetation typically occurs much sooner due to the limited timeframe and extent of <br />the associated disturbance. Occasionally perforated PVC pipe may be inserted in a completed borehole, and the <br />remainder of the hole backfilled with clean gravel, as a temporary piezometer installation to measure any fluctuation <br />in water-levels. This type of piezometer installation is normally very temporary (typically used less