To accommodate the large amount of slurry produced from the washed coal an additional Thickener Tank and pipeline <br /> will be installed in 2018. The new Thickener Tank will be located on the West side of the wash plant facilities and east <br /> of sediment pond D.The Tank will be 90 feet in diameter and approximately 14 feet tall. The Foundation supporting <br /> the Thickener Tank will consist of a concrete pad supported by approximately four feet of devised compacted fill <br /> that replaced the existed soil material. Limestone was placed on the northwest side of the thickener tank to a depth <br /> of around 15 feet to relieve any hydrostatic pressures that may exist from the shallow water table. During this <br /> addition pond D will be modified by reducing the east side to accommodate sufficient room for the new Thickener <br /> tank and installation of a pre sump to help settle out any sediment that could flow from the washplant facilities. In <br /> addition to the Thickener tank, a clarified water tank, a Deaeration tank, and a 40' x 50' out building enclosing the <br /> flocculant system and thickener pumps will be installed surrounding the new Thickener tank. A new thickener <br /> injection line consisting of double walled HDPE pipe with the outside pipe being 12 inches and the inside pipe <br /> being 8 inches will be installed to assist in pumping the thickener underflow to designated thickener underflow <br /> boreholes. <br /> TRI 9-93 2.05-29 03/05/19 <br />