Laserfiche WebLink
2. Mining Timetable <br /> Mining operations at the Lockhart Pit are expected to take at least 40 years to complete. Market <br /> demand will determine the actual production rate, but it is expected to be between 100,000 and <br /> 200,000 tons a year. Note that these values are not permit limits and should not be construed <br /> as such. An approximate mining timetable based on this production and the mining plan is <br /> shown in Table D-1. <br /> Table D-1 Mining Timetable <br /> Description Time Required <br /> East pod mining and reclamation 10 years <br /> West pod mining and reclamation 30 years <br /> Total 20 years <br /> Reclamation will occur concurrently with mining. Once mining in the West Pod nears <br /> completion, East Pod will have been partially reclaimed, and initial stripping of West Pod will <br /> begin. During the first 1-2 years of mining in East Pod, reclamation will be completed in West <br /> Pod. Reclamation will also occur concurrently with mining throughout West Pod. Final <br /> reclamation work will commence upon the completion of mining in West Pod. <br /> 3. Mine Facilities and Operation <br /> The site will contain the following facilities and equipment (all equipment is pre-existing and <br /> used for the current mining operations taking place prior to this amendment): <br /> Facilities: <br /> • Portable jaw crusher <br /> • Portable cone crusher <br /> • Portable screen decks <br /> • Portable stacking/transporting conveyors <br /> Equipment: <br /> • Front-end loaders <br /> • Bulldozers <br /> • Scrapers <br /> • Haul trucks (off highway) <br /> • Water truck(s) <br /> • Graders <br /> • Excavators <br /> • Backhoes <br /> Lockhart Pit D-3 0 Lewicki&Associates <br /> March 2024 <br />