My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2024-04-25_PERMIT FILE - M2024017
DRMS
>
Day Forward
>
Permit File
>
Minerals
>
M2024017
>
2024-04-25_PERMIT FILE - M2024017
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/20/2024 8:47:57 AM
Creation date
4/25/2024 1:27:28 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2024017
IBM Index Class Name
Permit File
Doc Date
4/25/2024
Doc Name Note
Exhibits A-H
Doc Name
Application
From
Kremmling All Season Rentals LLC
To
DRMS
Email Name
RAR
JLE
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
35
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Discharge from mining areas will take place within 72-HR of a storm event to prevent diversion <br /> of water rights. Discharge will be conducted via pump, weir, or pipe. The operator will sample <br /> water discharges as required by their Colo. Dept. of Public Health and Environment permits. <br /> Detaining water within active mining pods will allow for sediment to settle out and ensure clean <br /> water discharges. <br /> 6.1.2. Post Reclamation <br /> Drainage patterns for after reclamation can be seen on Map F-1. Each pod will drain as it did <br /> prior to mining. In general, this means drainage patterns will return runoff to the drainage draw <br /> between pods. Revegetation of the pods will ensure that stormwater runoff does not generate <br /> additional sediment discharges. <br /> 6.1.3. Flood Protection <br /> No mining takes places near the Colorado River or any other flooding waterway. <br /> 6.2. Disturbed Area Runoff <br /> During all stages of mining, there is enough water storage capacity to contain the 100-year 24- <br /> hour storm event and prevent erosion from surface water discharge. The expected rainfall from <br /> these events at the Lockhart Pit is provided in Table G-2 below. <br /> Table G-2 Area Storm Events (from NOAA') <br /> RainfallEvent Probability Event 100-YR 24-HR 2.33 <br /> Peak runoff for the 100-YR event was determined for premise, mine, and reclaimed conditions. <br /> Prior to mining all of the disturbed area freely drains to the drainage draws onsite. During <br /> mining, the mining pods have enough storage to contain the entire discharge from the storm <br /> event. Following reclamation, the mining pods return to freely draining in the same manner as <br /> prior to mining. Therefore, mining and reclamation will not create any additional drainage from <br /> the site. <br /> The discharge volumes from these storm events are calculated in Appendix G-1. The Exhibit C <br /> maps summarizes the drainage basins. All runoff calculations were conducted using the <br /> Rational Method as required by Grand County drainage criteria. Soil Hydrologic Group is taken <br /> from the soil report in Appendix I-1. Time of concentration is calculated from site topographic <br /> data. Storm date is from NOAA. <br /> 7. Groundwater <br /> Groundwater will not be interacted with at the Lockhart Pit. Groundwater is located over 100- <br /> feet below the bottom of the gravel deposit based on the nearest well data. While exact <br /> groundwater levels are not known from exploration and surrounding wells, groundwater is likely <br /> 'National Oceanic and Atmospheric Administration <br /> Lockhart Pit G-3 ® Lewicki&Associates <br /> March 2024 <br />
The URL can be used to link to this page
Your browser does not support the video tag.