Table E-2 Reclamation Volumes <br /> Material Available on Site Requirements for Reclamation <br /> Pod Area(acres) Topsoil Overburden Topsoil Required Overburden <br /> Stripped(CY) Stripped(CY) @ 12" (CY) Backfill <br /> Rea uired CY * <br /> East 22.8 121,000 0 121,000 75,000 <br /> West 75.3 34,000 0 34,000 101,000 <br /> Haul Road 0.1 0 0 0 0 <br /> Totals 98.2 155,000 0 155,000 176,000 <br /> Note:Volume calculated based on an average highwall height of 25 feet. <br /> 2. Topsoil Replacement <br /> An average of 12 inches of topsoil will be stripped from all new mining areas, and as an average <br /> of inches of topsoil will be replaced on all disturbed areas being reclaimed. This will be <br /> stockpiled for use in reclamation or direct placed. Topsoil will be replaced on areas that have <br /> been backfilled and graded for reclamation. Stripped topsoil will be placed directly for <br /> reclamation whenever possible. Topsoil will be replaced by dozers and haul trucks. Topsoiled <br /> areas will be disced to a depth of 12-inches. <br /> 3. Haul Roads and Access <br /> All haul roads will remain following reclamation for access to the two reclaimed mining pods. <br /> See Map F-1 for details. <br /> 4. Reclamation Timetable and Sequence <br /> The sequence and timing of reclamation can be seen in Table E-3 below. Reclamation of the <br /> entire site is estimated to be completed in 42 years. The reclamation schedule is dependent on <br /> the rate of mining which will fluctuate due to market demands. The operator will reclaim the site <br /> concurrently with the progression of mining to limit the total disturbance. <br /> Lockhart Pit <br /> E-2 0 Lewicki Si Associates <br /> March 2024 <br />