<br />Section 2.05.4(2)(d) Page 12 April 2022 (PR-09) <br />will be reclaimed to Prime Farmland (also refer to Section 2.06.6) and the other areas will be <br />reclaimed to dryland pasture. All areas will have approximately 24 inches of Bench 1 placed prior <br />to topsoil replacement. Please see Map 2.05.4-4, which delineates currently reclaimed areas, <br />unreclaimed areas, and the prime farmland area on the ERMR Property. Table 2.05.4(2)(d)-4 <br />below provides the overall topsoil balance for these remaining areas. <br /> <br />Table 2.05.4(2)(d)-4 Topsoil Balance North of BB & West of 2700 Road <br />Area Area <br />(acres) <br />Available <br />Thickness <br />(inches) <br /> Stockpiled <br />Topsoil1 <br />Dryland Pasture Areas 89 12.2 171,470 <br />Prime Farmland Area 4 24 13,266 <br />Total 184,736 <br />1Stockpiled topsoil values are from Table 2.05.4(2)(d)-2 Topsoil Stockpile Inventory <br /> <br />Topsoil from Pile 12 will be used for differential settling on the ERMR-Lloyd and ERMR-Benson <br />West irrigated pasture areas if necessary. Please see Section 12 below for further discussion on <br />differential settling management plan. <br /> <br />Topsoil piles D and C south of the facilities area will remain post mine for use at the discretion of <br />the surface landowner, or if deemed necessary used for differential settling mitigation on irrigate <br />pasture reclamation areas within the permit boundary. <br /> <br />Topsoil pile H will be taken to an ERMR property outside of the permit boundary. New Horizon <br />currently has an adequate amount of topsoil necessary to complete reclamation for the dryland <br />pasture areas on or directly adjacent to the ERMR-Johnson property, and this extra topsoil is a <br />long term benefit to an adjacent ERMR property. <br /> <br />Please see Map 2.05.4-4 for locations of topsoil piles discussed in this section. <br /> <br />10. Topsoil Preparation Procedures Prior to Seeding <br /> <br />This discussion has been divided into each of the three main post-mine land uses: Dryland Pasture <br />(DP), Irrigated Pasture (IP), and Irrigated Cropland (IC). Irrigated Cropland covers both prime and <br />non-prime farmland areas. In general, topsoil will not be placed while saturated, and will be <br />replaced along the contour, whenever feasible, to minimize potential erosion and topsoil/spoil <br />interface slippage problems. This practice will be discontinued on steep slopes where the safety of <br />the equipment operator is in jeopardy. <br />