Laserfiche WebLink
Ca <br />l <br />am <br />i <br />t <br />y <br /> D <br />r <br />aw <br />Calamity DrawTuttle DrawTuttle DrawTuttle DrawEnstrom DrawLincoln Haul Road(Permanent)Adjacent Support Facility(No topsoil removed or replaced)POND 015POND 013POND 012POND 016POND 018Irrigated Cropland Reference Area(Undisturbed)575056255625572557005800557557 <br />5 <br />0 <br />57755825582557755 <br />6 <br />2 <br />5 5650557557755650567557255700575056755700565056255650567557005725572557505700567556505650565056755 <br />7 <br />0 <br />0 <br />5 <br />7 <br />2 <br />557255750 <br />5725562556505650 <br />567556255600570057005575 55755th StreetBB Road5th Street5th StreetBB RoadBB Road2700 Road <br />2700 Road2700 Road <br />Lincoln St.BB Road63113635R15W <br />R16W <br />T46NT47NTopsoil 11ATopsoil 11BTopsoil DTopsoil CTopsoil HTopsoil 5Topsoil 14Topsoil 15Topsoil 16SCALE:1" = 400'ORIGINAL DATE:DWG. BY:APPROVED BY:DWG NO.Map 2.05.4-4FKF5/15/2015ESI/TCPTopsoil Replacement & P.O Box 628, Nucla, CO. 81424Permit No. C-1981-008New Horizon MineENI <br />MNOZIROHW EN400'0'400'800'400'0'400'800'Contour Interval 5 ft.Post Mine TopographyLegendCHKBYDATENO.REVISIONPermit BoundaryTownship & RangeDryland Pasture Reclamation AreasTopsoil StockpileRoadsStreamsIrrigated Pasture Reclamation AreasIrrigated Cropland Reclamation AreasNote: Please see Section 2.05.4(2)(d) for a historical description of topsoil replacement for the Morgan Property.Topsoil Replacement from StockpileDisturbance BoundaryTopsoil Stockpile Locations1/24/24Phase III Released AreasUpdated Topsoil Movement/Added Phase IIIMR-124TRTony2/13/23Updated Permit BoundaryTR-106TRTony2/22/23I, Trevor B. Ragsdale, hereby certify that this map has been reviewed by me and is trueand correct to the best of my knowledge andinformation, relying on information suppliedby experts employed by Elk Ridge Miningand Reclamation, LLC or qualified consultantsworking for Elk Ridge Mining and Reclamation, LLC, and that I am a Professional Engineer licensed in Colorado as required by theprovisions of C.R.S 12-25-101 through ENGINEERS CERTIFICATIONC.R.S. 12-25-119. IN WITNESS WHEREOF, I have herunder set my hand and affixed my seal.Updated Permit Boundary, PMT, and TopsoilTR-108TRTony1/24/24Replacement Movement and Piles