Laserfiche WebLink
- Portable toilet <br /> Equipment: <br /> - Front-end loaders <br /> - Bulldozers <br /> - Water trucks <br /> - Excavators <br /> - Conveyors <br /> - Crushing and Screening Equipment <br /> The operator shall will provide portable toilets and bottled water to employees on site during <br /> operations. Any fuel stored on site will have full secondary containment that can carry 110% of <br /> the fuel tank volume. All facilities will be removed during reclamation. <br /> 4. Topsoil and Overburden Handling <br /> No topsoil or overburden exist on the site. <br /> 5. Site Access <br /> The London Borrow Pit will be accessed via existing roadways on site. This road will remain in <br /> place after mining is completed. <br /> London Borrow Pit <br /> April 2024 C-2 Lewicki&Associates <br />