Laserfiche WebLink
Bulldozer Worksheet Cont'd Task#03A Page 1 of 2 <br /> BULLDOZER WORK <br /> Task description: Apply topsoil to affected lands <br /> Site: Collett Property Permit Action: New App Permit/Job#: M202205I <br /> PROJECT IDENTIFICATION <br /> Task#: 03A State: Colorado Abbreviation: None <br /> Date: 4/10/2023 County: Rio Blanco Filename: M051-03a <br /> User: ACY <br /> Agency or organization name: DRMS <br /> HOURLY EQUIPMENT COST <br /> Basic Machine: Cat D7R DS Series II LGP <br /> Horsepower: 240 <br /> Blade Type: Straight <br /> Attachment: 3-shank ripper <br /> Shift Basis: 1 per day <br /> Data Source: (CRG) <br /> Cost Breakdown: <br /> Utilization% <br /> Ownership Cost/Hour: $92.78 NA <br /> Operating Cost/Hour: $79.33 100 <br /> Ripper own.Cost/Hour: $8.37 NA <br /> Ripper op.Cost/Hour: $1.50 30 <br /> Operator Cost/Hour: $41.30 NA <br /> Total unit Cost/Hour: $223.28 <br /> Total Fleet Cost/Hour: $223.28 <br /> MATERIAL QUANTITIES <br /> Initial Volume: 4,907 <br /> Swell factor: 1.215 <br /> Loose volume: 5,962 LCY <br /> Source of estimated volume: 7.3 ac @ 5"of topsoill <br /> Source of estimated swell factor: Cat Handbook <br /> HOURLY PRODUCTION <br /> Average push distance: 250 feet <br /> Unadjusted hourly production: 230.4 LCY/hr <br /> Materials consistency description: Partly consolidated stockpile 1.1 <br /> Average push gradient: 15 % <br /> Average site altitude: 7,400 feet <br /> Material weight: 1,600 lbs/LCY <br /> Weight description: Top Soil <br /> Job Condition Correction Factor Source <br /> Operator Skill: 0.750 (AVG.) <br /> Material consistency: 1.100 (CAT HB) <br /> Dozing method: 1.000 (GEN.) <br /> Visibility: 1.000 (AVG.) <br />