Laserfiche WebLink
in the Craig Daily Press. The completeness determination was made in accordance with Section <br /> 3.03.2(1)(d). Maps 1 and 2, entitled SL24 Phase II Bond Release Area Delineation and submitted with <br /> the application, show the location of each proposed bond release parcel. <br /> Bond Release Parcels <br /> SL24 requests Phase II bond release for the following four parcels as per Table 2 and Map 1, below. <br /> Fa, <br /> ' B1 <br /> wB19 <br /> wale <br /> .weas <br /> wars <br /> 699 <br /> Map I: SL24 proposed Phase II bond release parcels are shown in yellow. <br /> Table 2. Summary of Bond Release Parcels Table 2 lists the parcels requested in SL24, the <br /> and Associated Acres acreages associated and the permitting action <br /> Parcel Acres Phase I releasing the parcels from phase I liability. <br /> FB 19 78.9 SL21 <br /> LAB 18 57.6 SL21 Public Notice <br /> LAB 19 117.8 SL21 TMI published notice of the bond release <br /> ZA17 44.0 SL21 applications in the Craig Daily Press once weekly <br /> for four consecutive weeks beginning on 4 August <br /> 2023. TMI also notified landowners within and adjacent to the mine permit area, and other interested <br /> parties of the application for bond release, as required by section 3.03.2(1). The Division received no <br /> written comments, objections, or requests for an informal conference regarding the bond release <br /> application. DRMS verified topsoil depths for the SL24 parcels in October 2017, September 2018, and <br /> October 2019. <br /> Bond Release Inspection <br /> As the SL24 application was deemed complete as submitted and no adequacy questions were posed by <br /> DRMS at that time, the Division conducted a bond release inspection on 11 October 2023. The site <br /> Permit Number C1981010 <br /> SL24 Page 4 of 16 <br />