Laserfiche WebLink
<br /> <br /> <br /> <br /> <br /> <br />April 1, 2024 <br /> <br /> <br />Neil Whitmer <br />Holcim - WCR, Inc. <br />1687 Cole Blvd, Suite 300 <br />Golden, CO 80401 <br /> <br /> <br />Re: Table Mountain Quarry - File No. M-1999-004 <br /> Holcim - WCR, Inc. <br /> Technical Revision (TR-3) <br /> Technical Revision - Reclamation Cost Estimates <br /> <br />Dear Neil Whitmer: <br /> <br />On April 1, 2024 the Division of Reclamation, Mining and Safety concluded its review of the <br />Technical Revision application submitted to the Division on March 26, 2024, addressing the <br />following: <br /> <br />Updated reclamation cost estimates for the addition of Solar Array/Ancillary Equipment at the Table <br />Mountain Quarry. <br /> <br />The decision reached by the Division is: approve. <br /> <br />The terms of Technical Revision No. 3 approved by the Division are hereby incorporated into Permit <br />No. M-1999-004. All other conditions and requirements of Permit No. M-1999-004 remain in full <br />force and effect. <br /> <br />The revised liability amount exceeds the financial warranty currently held (see below), please submit <br />additional bond or a rider to your existing bond that equals or exceeds the Revised Liability. The <br />revision will not be final until the bond is approved by the Division. <br /> <br /> <br />Bond Held: $208,171.00 <br />Prior Liability: $208,171.00 <br />Change in Liability: $78,166.00 <br />Revised Liability: $286,337.00 <br />Prior Permit Acreage: 561.40 <br />Change in Permit Acreage: 0.00 <br />Revised Permit Acreage: 561.40