Laserfiche WebLink
TABLE OF CONTENTS <br /> Page <br /> 1.0 INTRODUCTION 1 <br /> 2.0 AREA GEOLOGY 1 <br /> 3.0 SITE GEOLOGY 1 <br /> 4.0 EXISTING GROUNDWATER CONDITIONS 2 <br /> 5.0 GROUNDWATER MODEL 3 <br /> 5.1 Regional Topography 4 <br /> 5.2 Bedrock Surface 4 <br /> 5.3 Hydraulic Conductivity 4 <br /> 5.4 Specific Yield 5 <br /> 5.5 Boundary Conditions 5 <br /> 5.6 Internal Influences 6 <br /> 6.0 MODEL SIMULATIONS 7 <br /> 6.1 Existing Conditions 7 <br /> 6.2 Slurry Wall Installation 8 <br /> 6.2.1 Red Tierra Equities, LLC Section 20 Site Impacts 9 <br /> 6.3 Mitigation 10 <br /> 6.3.1 Cell 1 Slurry Wall Construction 11 <br /> 6.3.2 Cell 2 Slurry Wall Construction 11 <br /> 6.3.3 Cell 3 and 4 Slurry Wall Construction 12 <br /> 6.3.3.1 Cell 3 and Cell 4 Mitigation 13 <br /> 6.3.4 Combined Mitigation with Section 20 14 <br /> 6.3.4.1 Monarch Cell 1 Slurry Wall with Section 20 14 <br /> 6.3.4.2 Monarch Cell 3 Slurry Wall with Section 20 15 <br /> 6.3.4.3 Monarch DENM and Section 20 Full Build Out 15 <br /> 7.0 CONCLUSIONS 17 <br /> 8.0 REFERENCES 17 <br /> Tables <br /> Table 1 Boundary Conditions 6 <br /> Table 2 Measured and Modeled Site Groundwater Levels 8 <br /> Table 3 Surrounding Property Groundwater Elevations 9 <br /> Table 4 Surrounding Property Groundwater Elevations—Both Sites 10 <br /> Table 5 Base Model and Modeled Site Groundwater Level After Cell 1 Slurry Wall 11 <br /> Table 6 Base Model and Modeled Site Groundwater Level After Cell 1, and 2 Slurry Walls 12 <br /> Table 7 Base Model and Modeled Site Groundwater Level After Cell 1, 2, 3, and 4 Slurry Walls 13 <br /> Table 8 Cell 3 and 4 Slurry Wall with Underdrain Mitigation 14 <br /> Table 9 Monarch DENM and Section 20 Approximate Construction Timeline 14 <br /> Table 10 Cell 1 and Section 20 Cell 3 and 4 Groundwater Elevations 15 <br /> Groundwater Model Report—Monarch DENM Gravel Mine Site -ii- January 2023 <br />