Laserfiche WebLink
Exhibit D <br /> Reclamation plan <br /> The Reclamation plan is to backfill the affected area with as much fill <br /> material, imported from another mine sight, as needed to be <br /> compatible with the surrounding area and to obtain a 3:1 slope, then <br /> coat the effected area with 3-4 inches of topsoil using an excavator as <br /> to not disturb any more vegetation as possible, prior to mining the <br /> vegetation was separated and is stored around the perimeter of the <br /> site, that vegetation will be pulled back across the fill area using an <br /> excavator to aid in getting re growth of the original vegetation. <br /> Additional seeding will be done with an ATV and a broadcast seeder, at <br /> a rate 2 times greater than if it was drilled. (See attachment Exhibit D <br /> attachment A) for seed mixture. Also, winter wheat seed will be added <br /> with the grass seed to get a quicker protective stand. <br /> After seeding a mixture of fertilizer will be applied (See attachment <br /> Exhibit D attachment B) using a broadcast spreader at the rate listed in <br /> the attachment B. <br /> After all seeding and fertilizing is completed, we will water the <br /> planted/reclaimed area with a water truck to speed up the growth <br /> process. <br />