Laserfiche WebLink
Email Address* <br /> Enter a valid email address in this field to receive a confirmation e-mail. <br /> golfrevsolutions@gmail.com <br /> Your Phone Number* <br /> Used only to follow up. <br /> 2145420990 <br /> Extension <br /> Alternate Phone Number <br /> Used only to follow up. <br /> Alternate Phone Extension <br /> Connection to Operation <br /> Select all that apply <br /> Land Owner of affected land Structure Owner within 200' of affected land <br /> Mineral Owner Nearby Resident <br /> Adjacent Land Owner ✓ Concerned Citizen <br /> Government Agency Other <br /> DESCRIPTION OF COMMENT OR OBJECTION <br /> You are providing a comment or objection to the public record of a permitting action currently under review by the Division of <br /> Reclamation, Mining and Safety.This form is not intended for reporting of possible violations or illegal activity. Please be as specific <br /> as possible. <br /> Comment/Objection Narrative <br /> Sample Objections Statements <br /> The following samples can be copied and pasted into the DRMS form. Please modify the statements or craft <br /> your own statements to reflect your sentiment and concerns. <br /> I would suggest that the objection letter begin with an introduction along the following lines followed by <br /> whatever it is that you want to say: <br /> Example 1 Opening- <br /> To whom it may concern: <br /> Please accept this communication as an objection to the CJK Milling Company Application. <br /> Example 2 Opening- <br /> To whom it may concern: <br /> Please accept this communication expressing my concern in regard to the CJK Milling Company Application. <br /> OBJECTION THOUGHTS/IDEAS/THEMES FOR THE BODY OF YOUR OBJECTION SUBMITTAL: <br /> Water Focused Objection <br /> The impact on the upper Arkansas River basin and particularly the Leadville area is significant. Impacts include <br /> potential cyanide and other chemical contamination of surface and groundwater.The mill waste pile will be a <br /> potential source of water contamination risks forever,yet the mill plan does not address perpetual monitoring <br /> and management of the waste pile. High water consumption based on dubious efficiency claims may reduce <br /> water availability in the Leadville area for residential and other uses.These water issues alone are so significant <br /> the mill should not be permitted to operate. <br /> Broad Objection <br /> I object to this application on numerous grounds: use of cyanide in processing tailings;disturbance of and <br /> transport of tailings from East Side of Leadville to Mill site; no foolproof method to guarantee no leakage of <br /> cyanide&other chemicals from proposed dry stack method of storage of processed materials;threat of leakage <br /> into water table of cyanide/other chemicals into groundwater,affecting wells,fishing/rafting industry, irrigation <br />