My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2024-03-12_REVISION - C1981022 (9)
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1981022
>
2024-03-12_REVISION - C1981022 (9)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/12/2024 3:37:17 PM
Creation date
3/12/2024 3:35:43 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981022
IBM Index Class Name
Revision
Doc Date
3/12/2024
Doc Name
Proposed Decision Letter & Form
From
DRMS
To
Oxbow Mining, LLC
Type & Sequence
RN8
Email Name
LDS
AME
Media Type
D
Archive
No
Supplemental fields
Permit Order
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> <br />1313 Sherman St. Room 215 Denver, CO 80203 P (303) 866-3567 F (303) 832-8106 https://drms.colorado.gov <br />Jared Polis, Governor | Dan Gibbs, Executive Director | Michael A. Cunningham, Director <br />March 12, 2024 <br /> <br />Doug Smith <br />Oxbow Mining, LLC <br />3737 Hwy 133 <br />P.O. Box 535 <br />Somerset, CO 81434 <br /> <br />Re: Proposed Decision <br /> Permit Renewal Application No. 8 (RN-8) <br /> Elk Creek Mine (Permit No. C-1981-022) <br /> <br />Dear Mr. Smith: <br /> <br />Enclosed you will find the Division of Reclamation, Mining and Safety's Proposed Decision Package for <br />Permit Renewal No. 8 at the Elk Creek Mine. Notice of the proposed decision will be published in the Delta <br />County Independent as soon as possible. The thirty (30) day public comment period for the Division's decision <br />will begin on the day following the first publication. <br /> <br />Documentation must be submitted to the Division demonstrating that a copy of the approved renewal materials <br />were sent to the Office of Surface Mining and the Bureau of Land Management. The materials should be sent <br />within 15 days of final approval. <br /> <br />Please refer to the Performance Bond heading on the enclosed proposed decision form. If the amount of Bond <br />Held equals or exceeds the Revised Liability, you need not submit additional bond. However, if the Revised <br />Liability exceeds the Bond Held, please submit additional bond or rider to your existing bond that equals or <br />exceeds the Revised Liability. The permit will not be issued until the Division has received and approved the <br />bond. <br /> <br />If there are stipulations attached, please sign and return the proposed decision form to the Division. If you <br />have any questions, please contact me.
The URL can be used to link to this page
Your browser does not support the video tag.