Laserfiche WebLink
-4- <br /> 12. Primafuture(Post-mining)land use(check one): <br /> Cropland(CR)enTi <br /> ! I Pastureland(PL) 11 General Agriculture(GA) <br /> ri Rangeland(RL) fJ Forestry(FR) Wildlife Habitat(WL) <br /> 1-1 Residential(RS) lI Recreation(RC) . Industrial/Commercial(IC) <br /> ElDeveloped Water Resources(WR) _El Solid Waste Disposal(WD) <br /> 13. Primary present land use(check one : <br /> tCropland(CR) Pastureland(PL) General Agriculture(GA) <br /> 0 Rangeland(RL) Forestry(FR) �'( Wildlife Habitat(WL) <br /> Residential(RS) j1 Recreation(RC) !_1 Industrial/Commercial(IC) <br /> MIMI <br /> Developed Water Resources(WR) <br /> 14. Method of Mining: Briefly explain mining method(e.g.truck/shovel): <br /> Excavation by Excavator, Loader, or Dozer and taken to processing area via haul trucks and/or conveyor. <br /> 15. On Site Processing: I✓I Crushing/Screening <br /> 13.1 Briefly explain mining method(e.g.truck/shovel): <br /> On-site crushing/screening fed by loader. <br /> List any designated chemicals or acid-producing materials to be used or stored within permit area: <br /> N/A <br /> 16. Description of Amendment or Conversion: <br /> If you are amending or converting an existing operation,provide a brief narrative describing the proposed change(s). <br /> N/A <br />